Laserfiche WebLink
<br />CIP Discussion <br />4/12/2007 <br />Page 2 <br /> <br />Alternative 3 Removing curb from both sides approximately 200' back from $54,875 <br /> the intersection, creating a gradual taper to a street width of <br /> 32' at catch basins and pavement width of 80' at the entrance. <br /> Involves tree removal, construction of retaining wall and <br /> relocation of two catch basins. <br />Alternative 4 Removing curb from both sides of the street (I70' east, 80' $32,400 <br /> west), creating a gradual taper to a street width of 32' at the <br /> catch basins and pavement width of 80' at the entrance. <br /> Involves relocation oftwo catch basins. <br /> <br />As part of the 2006 PMP wrap-up, staff would like to send out a survey to the residents for <br />feedback on various aspects of the project. One of the questions staff could ask is how residents <br />feel about the intersection and whether they think it needs to be modified from what has been <br />constructed. A draft of the survey is attached. <br /> <br />CONCLUSION <br /> <br />Staff is requesting questions and/or comments from the City Council regarding this issue prior to <br />staff scheduling a neighborhood meeting. <br />