My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-29-07 Item 6A, 2007 PMP Assessment Hearing
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
05-29-07-R
>
05-29-07 Item 6A, 2007 PMP Assessment Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 4:41:35 PM
Creation date
5/25/2007 11:04:56 AM
Metadata
Fields
Template:
General
Document
05-29-07 Item 6A, 07 PMP Hearing
General - Type
Agenda Item
Category
2007 PMP Hearing
Date
5/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />November 29, 2006 <br /> <br />RE: 2007 Pavement Management Program Information meeting <br />6:30 p.m.. Tuesdav. December 12. 2006 <br /> <br />Dear Property Owner: <br /> <br />As part of the City of Arden Hills' ongoing street maintenance program, residential streets which have <br />curb and gutter but have a poor driving surface are improved using a mill and overlay process. This <br />process usually consists of grinding a portion of the existing surface off the roadway and replacing it with <br />a new blacktop driving surface. Portions of more deteriorated streets are totally removed and replaced. <br />As part of the process, sunken or badly deteriorated curbs are replaced. Minor utility repairs are also <br />scheduled. <br /> <br />The City Council has selected the following streets to be considered for improvements as part of the <br />City's 2007 Pavement Management Program: <br />Katie Lane Connelly Avenue <br />Katie Court Lametti Lane <br />Brighton Way Lametti Circle <br /> <br />Dawn Circle East <br />Briarknoll Circle <br />Briarknoll Drive <br /> <br />Royal Lane <br />Karth Lake Circle <br /> <br />City staff is in the process of collecting survey information and preparing a feasibility report to be <br />presented to the City Council at a public hearing in January 2007. This report will outline the proposed <br />project and will include an estimate of project costs. The project will be fmanced using a combination of <br />Assessments and City Infrastructure funds. <br /> <br />Weare in the preliminary planning stages of this project and are interested in working with property <br />owners on issue identification and plan development. Please come to our first meeting: <br /> <br />6:30 p.m.. Tuesdav. December 12. 2006 <br />City Council Chambers <br />Arden Hills City Hall <br />1245 West Highway 96 <br />Arden Hills, Minnesota 55112 <br /> <br />The meeting will consist of a brief presentation by City Staff on the City's Pavement Management <br />Program- typical roadway construction, typical assessment amounts and how they are calculated. The <br />presentation will be followed by a group discussion and a question and answer period. <br /> <br />We encourage you to attend this meeting. We look forward to meeting you and discussing the project. If <br />you have any questions or are unable to attend this meeting, please contact me at 651-634-5228 or <br />kristine. giga(a),ci.arden-hills.mn. us. <br /> <br />S~~ :d~ <br /> <br />Kristine Giga <br />Civil Engineer <br /> <br />\\RYFS3\Roseville$\Public Works\Engineering\Projects\2007 _Projects\2007Contract_ B\correspondence\ArdenHiIls\12 _12_ 06mtg.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.