<br />~ <br />~~HILLS <br /> <br />2007 PMP <br />Project Update <br /> <br />Volume 1 Number 1 April 17, 2007 <br /> <br />Project Summary <br />As part of the City of Arden Hills' ongoing pavement <br />management program (PMP), residential streets <br />which have curb and gutter but have a poor driving <br />surface are improved using a mill and overlay <br />process. This process usually consists of grinding <br />all or a portion of the existing surface off the <br />roadway and replacing it with a new blacktop <br />driving surface. As part of the process, sunken or <br />badly deteriorated curbs will be replaced. Minor <br />utility repairs are also scheduled. <br /> <br />The City Council approved the award to the <br />Contractor, Midwest Asphalt, at the March 26, 2007 <br />Council Meeting. Work in your neighborhood <br />should begin within a month. <br /> <br />To following streets are included in this project: <br />Briarknoll Circle (Briarknoll Drive to cul- de- sac) <br />Briarknoll Drive (N. Snelling to Norma Avenue) <br />Connelly Avenue (off County Road E) <br />Royal Lane (Floral Drive to Norma Avenue) <br />Karth Lake Circle (Hamline to cul- de- sac) <br />Brighton Way (off New Brighton Blvd) <br />Lametti Circle (Lametti Lane to cul- de- sac) <br />Lametti Lane (Old Snelling to cul- de- sac) <br />Dawn Circle East (Norma Avenue to cul- de- sac) <br /> <br />If your street is not included in the above list, it is <br />not included in this contract. In the interest of <br />providing information to all property owners <br />impacted by this project, this newsletter is also <br />being mailed to residents on surrounding streets. <br /> <br />Survey Markers are used in order to perform the <br />project construction. Engineers place a series of <br />survey markers for the Contractor to measure from. <br />Typically these markers are offset several feet from <br />the object or point they refer to so that they are not <br />disturbed during the construction process. As a <br />result, these offset markers are often placed well <br />into resident's yard. Please notify Baron Behning, <br />Project Coordinator, of any stakes that have been <br />moved inadvertently. <br /> <br />Safety <br />Your assistance in maintaining a safe work area is <br />necessary and important. The size, weight, noise <br />and dust created by construction traffic make it <br />difficult for workers tD watch onlDokers. Heavy <br />equipment operators must concentrate on the job at <br />hand and may not notice children playing near or <br />behind equipment. Residents should use caution <br />at all times while driving through the constructiDn <br />zone and be alert for moving equipment, holes, <br />trenches and other hazards in the work zone. <br />Please remind children to stay clear of the <br />construction area and equipment both during <br />working and non-working hours. <br /> <br />Access <br />The construction project will be staged so that <br />residents and emergency vehicles will have access <br />at all times. <br /> <br />Questions? <br />The work in Arden Hills has been combined with <br />similar cDnstruction work in the City of Roseville. <br />The City of RDseville Engineering Department has <br />developed the project plans and specifications with <br />the assistance of Arden Hills staff. We look forward <br />to working with you on this project. <br /> <br />As this project progresses we will keep you <br />informed through newsletters and through contact <br />on the job site. We will also post information Dn the <br />City's website: www.ci.arden-hills.mn.us. If you <br />have any questions, concerns, or comments please <br />do not hesitate to contact us. We will work together <br />with you and the contractor to complete this project <br />in a timely manner. <br /> <br />