My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-07-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
06-06-07-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 9:03:24 AM
Creation date
6/1/2007 9:10:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />June 6, 2007 <br /> <br />PC Agenda Item 3.B <br /> <br /> <br />TO: Planning Commission <br />FROM: James Lehnhoff, City Plann~ <br /> <br />SUBJECT: Planning Case #: 07-013 <br />Planned Unit Development Amendment <br />Hood Packaging Corporation (Matthew Hegstrom) <br />1887 Gateway Boulevard <br /> <br />ATTACHMENTS: 3B-I Application and Supporting Materials <br />3B-2 Air Photo and Photographs <br /> <br />ReQuested Action <br /> <br />The applicants have requested a Planned Unit Development Amendment to install two 2,000 <br />gallon storage tanks to the southeast side of the building at 1887 Gateway Boulevard. <br /> <br />Backl!:round <br /> <br />1. Overview of Request: <br /> <br />Hood Packaging Corporation is located at 1887 Gateway Boulevard in the Gateway Business <br />(GB) Zone on Interstate 35W. Hood Packaging is a national company that manufactures <br />various types of paper and plastic packaging products. The company is a conforming use in <br />the GB Zone. The applicant is requesting a Planned Unit Development (PUD) amendment to <br />install two additional 2,000 gallon storage tanks to the southeast side of their building. Each <br />tank is fourteen feet long, five feet four inches tall, and five feet four inches in diameter. The <br />tanks have a double wall construction and sensors to reduce the possibility ofleaks <br /> <br />The applicant has submitted a letter explaining the basis for the request; however, in sum, the <br />two tanks would be used to store solvents and waste materials used in their manufacturing <br />process (Attachment 3B-I). The stored materials would be transported offsite each month <br /> <br />City of Arden Hills <br />Planning Commission Meeting for June 6, 2007 <br /> <br />\\Metro-inet.uslardenhills\PlanningIPlanning Cases\2007\07~013 Hood Packaging PUD Amendment (PENDING)\060607 _ PC Report N Hood <br />Packaging PUD Amendment.doc <br /> <br />Page 1 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.