My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-07-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
06-06-07-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 9:03:24 AM
Creation date
6/1/2007 9:10:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 <br />Date: May 24, 2007 <br />To: City of Arden Hills Planning Commission and City Council <br />% Mr. James Lehnhoff, City Planner <br />Re: Celestica Parking Lot Addition - 4300 Round Lake Road West, Arden Hills, MN <br /> <br /> <br />PROJECT BACKGROUND <br /> <br /> <br />complex of buildings which was not expected in the original design of the complex. It was assumed <br />that the ability for shared parking existed to accommodate these variable needs between the adjacent <br />properties. In essence this complex was designed as a Planned Unit Development even though the <br />designation was not officially given to the development by the City due to the G-B Zoning. <br /> <br />This 11.18 acre property is located at 4300 Round Lake Road West and is bordered by office <br />warehouse buildings to the north and the south. 1-35W is to the west and Round Lake is to the East. <br />The site is currently zoned G-B Gateway Business and is fully developed with a 174,304 square foot <br />office/warehouse building with parking surrounding the structure. The perimeters are well landscaped <br />and the furthest eastern slope on the property is naturally wooded. <br /> <br />The original design of the site with the loading docks placed on the south side of the building <br />concerned the City Council in the original approvals and as a result the south border of the property <br />was heavily landscaped. Subsequently, Welsh acquired the property to the south and the scope of <br />their Gateway Business Park project expanded to include the three existing buildings located to the <br />south of this site. As a result, we prepared an EAW for the overall development because of the scale <br />of the project and several natural features were protected or enhanced as a result of that process. <br /> <br />One of the outcomes of the expansion of the project was the re-routing of Round Lake Road West <br />and the addition of Gateway Court. The significance on this project is that this site was already <br />developed and additional right of way was needed from this site to create the Gateway Court cul-du- <br />sac. That is why the building coverage is slightly over (30.8%) the maximum allowable coverage of <br />30% for a one story building in this zoning district. This also impacted on the pervious/impervious <br />percentages for the property. <br /> <br />GRADING. DRAINAGE AND EROSION CONTROL: <br /> <br />The proposed grading to accommodate the additional parking surface will be a natural extension of <br />the existing parking surface grades and be accommodated in the existing storm sewer system <br />currently located in this portion of the property. Standard erosion control methods will be used during <br />the construction of the parking lot expansion to minimize erosion. The small scale of the project and <br />the short construction time line will also help to minimize any erosion impacts generated with this <br />construction activity. <br /> <br />STORMWATER DESIGN <br /> <br />In the process of analyzing the site's sub-watershed makeup, several options were analyzed to <br />provide for adequate treatment of the increase In storm water runoff. The first two options that were <br />reviewed were infiltration treatment or filtration treatment. Both of these options are dependent on <br />having soils that are conducive to storm water permeating the existing soils. Our geotechnical <br />engineering firm, Braun Intertec, analyzed the soils and their preliminary findings are that the soils are <br /> <br />7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128 <br />PHONE (651) 739-8131 FAX (651) 739-0846 <br />www.proterradesign.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.