Laserfiche WebLink
<br />Table 4-11 <br />MnDOT Highway Work Plan, 2009-2013 <br />Major Construction, Reconstruction and Bridge Replacement Greater Than $10 Million <br /> <br /> Proiect Cost Estimates <br /> Design R1W Year-of- Construction Total <br /> Project Construction Estimate Estimate Construction Engineering Project <br />Highw3)' Description Program Fiscal Year ($000) ($000) Estimate Estimate Cost <br /> ($000) ($000) ($000) <br />35E ]-94 to Maryland MC 2010 7.687 Limited 76.755 6,140 90,57] <br /> Ave. in St. Paul, <br /> grading, surfacing, <br /> brs., etc., including <br /> Cayuga Br. and <br /> Phalen Blvd. <br /> connection <br />35W At Lake St. in MC 2009 1,]60 Contin- 1],600 928 13,688 <br /> Minneapolis, liDUS/ <br /> reconstruct inter- Major <br /> change (Ph. I) <br />35W At Lake St. in MC 20]0 1,785 Contin- 17.850 1.428 21.063 <br /> Minneapolis, liOUS/ <br /> reconstruct inter- Major <br /> change (Ph. 2) <br />36 At Lexington MC 2009 1,380 Limited 13,804 1,]04 16,289 <br /> Ave.. in RoseviIJe, <br /> replace Bf. 5723 <br /> and reconstruct <br /> interchange <br />100 36lh St. to Cedar MC 2011 6,150 Contin- 61,500 4,920 72,570 <br /> Lake Rd. in St. liOUS/ <br /> Louis Park, Major <br /> grading, surfacing, <br /> Brs., etc. for 6-lane <br /> freeway <br />169 Near CSAH 6 in MC 2010 ],904 Limited 19,040 1,523 22.467 <br /> Belle Plaine, <br /> grading, surfacing, <br /> Br., etc. for new <br /> interchange <br />694 E of135W in MC 2012 6,960 Minimall 69,596 5,568 82,]23 <br /> Arden Hills to E of Spot <br /> Lexington Ave.. in <br /> Shoreview, <br /> grading, surfacing, <br /> Brs., etc. to add <br /> third lane and <br /> correct weave at <br /> TH 10/51 <br /> TOTALS 27,015 270,145 21,611 318,771 <br /> <br />T-]6 <br />