My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-29-07 Item 7E, Resolution 07-27 Feasibility Report Prep Order
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
01-29-07-WS
>
01-29-07 Item 7E, Resolution 07-27 Feasibility Report Prep Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:25:41 PM
Creation date
6/19/2007 2:29:29 PM
Metadata
Fields
Template:
General
Document
01-29-07 Item 7E, Resolution 07-27
General - Type
Agenda Item
Category
Resolution 07-27 Feasibility Study
Date
1/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONSTRUCTION AGREEMENT <br />2008 Reconstruction Project <br /> <br />This Agreement is made on , between the City ofRoseville, a <br />Minnesota municipal corporation ("Roseville"), and the City of Arden Hills, a Minnesota <br />municipal corporation ("Arden Hills"). <br /> <br />1. PURPOSE <br /> <br />Roseville and Arden Hills (Collectively the "Cities") have determined that it is in the best <br />interests of the residents of each city to undertake in a cooperative fashion their 2008 <br />Reconstruction Project (the "Project"). The goal of the Cities is to provide for a coordinated cost <br />effective completion of the Project and the associated benefits of economy of scale. The purpose <br />of this agreement is to set forth the terms governing the design and construction of the Project. <br /> <br />2. PROJECT <br /> <br />2.1 The Project shall consist of the facilities identified in Exhibit A hereto, subject to <br />modification as provided herein. <br /> <br />2.2 <br />hereof. <br /> <br />The costs of the Project will be paid by the Cities as provided in Section 5.1 <br /> <br />3. DESIGN <br /> <br />3. I Roseville, will prepare, or have prepared, engineering drawings, specifications <br />and construction plans for the Project. The construction plans will include a cost estimate. The <br />final cost estimate will include all costs associated with the Project as well as a contingency <br />budget for unforeseeable circumstances associated with the construction. Roseville will comply <br />with any requirements of Minnesota law with respect to approvals of such plans and <br />specifications. <br /> <br />3.2 Construction plans, engineering drawings, specifications and cost estimates will <br />be submitted to each city for the approval of each city council. <br /> <br />4.1 CONSTRUCTION <br /> <br />4. I If final construction plans and specifications are approved by each city council, <br />Roseville shall proceed with construction of the Project. Roseville will advertise for bids in <br />accordance with the requirements of the municipal contracting law. <br /> <br />4.2 Prior to awarding construction contracts Roseville will review the bids received <br />with Arden Hills. If the contracts exceed the cost estimates contained in the construction plans <br />(including a contingency budget) previously approved by the Cities, the bids must be approved <br />by each city councilor the project may not proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.