My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-01-07-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
08-01-07-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 9:03:24 AM
Creation date
7/26/2007 1:30:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MemOfandum <br /> <br />1800 Pioneer Creek Center, Maple Plain, MN 55359 <br />Phone: 763-479-4200 Fax: 763-479-4242 <br /> <br /> <br />nck <br /> <br />To: <br /> <br />Dennis Trooien, Dcnnis Properties <br />Jim Ben~~ and Aravind Goltemu&~a <br />June 29,2007 <br /> <br />From: <br /> <br />Date: <br /> <br />Subject: <br /> <br />Traffic Study for Proposed Redevelopmcnt of Arden Plaza <br /> <br />PURPOSE AND BACKGROUND <br /> <br />The purpose of this memorandum is to present the results of our traffic study for the proposed <br />redevelopment of Arden Plaza in the City of Ardcn Hills. This traffic study addressed the <br />following two principal traffic questions: <br /> <br />a) To what extent would the proposed redcvelopment alter the total vehicle trips entering <br />and exiting the site during the a.m. peak hour, p.m. peak hour, and on a daily basis? <br /> <br />b) To what extent would the proposed redevelopment alter the ability of the motorists to <br />enter and exit the site at the two site access locations during the p.m. peak hour (i.c. <br />driveway on County Road E and driveway on Lexington Avenue)'! <br /> <br />The subject site is located in the southwest quadrant of the County Road E/Lexington A venue <br />intersection. The site presently consists of the following uses: <br /> <br />. Three intcrconnectcd officc buildings with a total gross floor area of 45,954 SF (square <br />feet) of which 29,429 SF presently is occupied and the remaining l6,5l5 SF is vacant. <br /> <br />. Retail building with a total gross floor area of approximately 55,500 SF of which 52,500 <br />SF presently is occupied and the remaining 3,000 SF is vacant. <br /> <br />The proposed redevelopment plan will retain the existing retail building and will replace the <br />three office buildings with the following uses: <br /> <br />· 14,386 SF pharmacy with drive-through <br />. 16,230 SF supermarket <br />. 14,400 SF retail or office] <br /> <br />The proposed redevelopment will not alter the existing access arrangements for the site, which <br />include one driveway on County Road E and one driveway on Lexington A venue. The proposed <br />redevelopment is expected to be complete by 2008. <br /> <br />I To be conservative in trip generation and traffic volume estimates, we assumed retail for traffic forecasting purposes. <br />T:\193J\Ol\Tr~I'fid.'~Il11l.<Joc <br />
The URL can be used to link to this page
Your browser does not support the video tag.