My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-07 Agenda Item 2A, City Hall Repair Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
08-20-07-WS
>
08-20-07 Agenda Item 2A, City Hall Repair Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 12:47:10 PM
Creation date
8/16/2007 3:52:12 PM
Metadata
Fields
Template:
General
Document
Agenda Item 2A, City Hall Repair Update
General - Type
Agenda Item
Addressee
1245 West Highway 96
Date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. Staff rented a drill 8/21/01 to do a core drill thru the floor to help determine ifthe <br />water infiltration was corning up thru the floor. <br /> <br /> <br />3. Inspec bill 10/4/01 was for investigative reporting on foundation waterproofIng. <br /> <br />4. Inspec bill dated 8/31/03 was for follow up investigation on thru wall flashing at <br />the top of the foundation wall. <br /> <br />5. AET bill dated 11/25/03 was for mold investigation report for the lower leveL <br /> <br />6. Inspec bill dated 11/25/03 was for follow up investigation on thru wall flashing at <br />the top ofthe foundation wall. <br /> <br />7. AET bill dated 12/30/03 was for mold investigation report for the lobby ceiling. <br /> <br />8. Air Tech bill was for indoor air testing for quality/mold. <br /> <br />9. AET bills dated 3/9 for follow up investigation of mold mildew in the building. <br /> <br />10. AET bills dated 7/12 for follow up investigation of mold mildew in the building. <br /> <br />11. AET bills dated 8/13/04 for follow up investigation of mold mildew in the <br />building. <br /> <br />12. Inspec's bills dated 8/23/04 was for consultation of continued water infIltration <br />tssues. <br /> <br />13. Inspec's bills dated 10/29/04 was for consultation of continued water infIltration <br />issues. <br /> <br />14. Inspec's bills dated 11/26/04 was for consultation of continued water infiltration <br />Issues. <br /> <br />15. Rentals was for a lift to repair lobby ceiling. <br /> <br />16. BRC bill dated 8/4/05 was to investigate the parapet caps for proper sealant and <br />installation. <br /> <br />17. WJE bill dated 1/18/06 was to do background research on the water infIltration <br />problems at City Hall. <br /> <br />18. KA bill dated 1/27/06 was to build a heated enclosure for the water testing. <br /> <br />19. WJE bill dated 2/27/06 was for water testing, phase 2 <br /> <br />20. WJE bill dated 3/1 7/06 was for water testing phase 2 <br /> <br />21. BRC bill dated 3/23/06 was for removal ofthe stone for testing <br /> <br />\\Metro-inetus\ardenhills\Building\City Hall\City Halt costs\City Hall costs\Full Document8-lO-07.doc Page II of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.