Laserfiche WebLink
<br />22. WJE for additional testing recently completed & in progress <br /> <br /> <br />23. BRC bill dated 8/14//06 was for removal of the stone for testing <br /> <br /> <br />24. WJE bill dated 7/30/06 was for water testing, <br /> <br /> <br />25. WJE bill dated 9/18/06 was for water testing, investigation <br /> <br /> <br />26. WJE bill dated 10/19/06 was for water testing, investigation <br /> <br /> <br />27. WJE bill dated 12/14/06 was for arbitration related services <br /> <br /> <br />28. WJE bill dated 1/17/07 was for chinmey repair design <br /> <br /> <br />29. WJE bill dated 3/8/07 was for chinmey repair design. <br /> <br /> <br />30. WJE bill dated 4/25/07 was for chinmey repair design <br /> <br /> <br />31. WJE bill dated 4/25/07 was for chimney repair design <br /> <br /> <br />32. WJE bill dated 6/20/07 was for chinmey repair desigu <br /> <br /> <br />33. Construction Results for lobby repair. <br /> <br />\\Metro-inet.us\ardenhills\Building\City Ha11\City Hall costs\City Hall costs\Full DocumentS-1O...Q7.doc Page 12 of 12 <br />