My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-24-07 Item 4H, Storm Sewer Modifications Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
09-24-07-R
>
09-24-07 Item 4H, Storm Sewer Modifications Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2007 11:46:38 AM
Creation date
9/20/2007 11:44:15 AM
Metadata
Fields
Template:
General
Document
Item 4H, Storm Sewer Modifications
General - Type
Agenda Item
Date
9/24/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2007 Stonn Sewer <br />9/20/2007 <br />Page 3 <br /> <br />Forest Lake Contracting $ 157,200.50 $ 26,810.00 <br />Northdale Construction $ 183,353.29 $ 29,447.18 <br /> <br />The 2007 budget included $20,000 from the Surface Water Enterprise Fund for storm sewer <br />improvements in the 2007 PMP. The actual project costs for the 2007 PMP totaled $8,978.81, <br />which includes 15% for engineering fees. The cost of this project is $20, I 07.00. The sum of <br />these costs would exceed the budgeted $20,000 by $9,085.81. There would be no additional <br />engineering fees, as the engineering was completed as a part of the 2007 PMP. <br /> <br />RECOMMENDED COUNCIL ACTION <br /> <br />Motion to award bid for 2007 Storm Sewer Modifications Project to Burschville Construction. <br />Award of the project is contingent upon Roseville's City Council Approval. <br /> <br />\\Melro-ineLlls\ardenhills\PR&PW\Engineering\2007\Council_ Actiol1s\9-24-07MemoA ward _ ST -07-13 _ 2007PM PStonn.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.