My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />can enhance its commitment to the greater community, including neighborhoods and <br />residents near the university. <br /> <br />E, DENSITY OF INTENSITY OF LAND USE <br /> <br />The College currently has 1,650 full time equivalent students with 514 associated <br />staff and faculty. With the proposed increase to 2,400 FTE's and the related increase <br />in staff and faculty (168), total campus usage will be 3,082, There are fifteen (15) <br />existing buildings on approximately 107 acres, With the proposed increase in <br />buildings, total campus usage will be twenty (20) buildings. Building gross square <br />footage will increase from the current approximate 656,306 square feet to <br />approximately 1,089,812 square feet, or by 433,506 square feet To break this down <br />by city, the estimated distribution is as follows: <br /> <br />Existing GSF in Arden Hills <br />Existing GSF in Roseville <br />Total Existing GSF <br /> <br />275,103 <br />381,203 <br />656,306 <br /> <br />Proposed Additional GSF in AH <br />Proposed Additional GSF in Roseville <br />Total Proposed Additional GSF <br /> <br />185,740 <br />247,766 <br />433,506 <br /> <br />Total GSF at Buildout in AH <br />Total GSF at Buildout in Roseville <br />Total GSF at Buildout <br /> <br />460,843 <br />628,969 <br />1,089,812 <br /> <br />* All numbers are approximate, estimated on general information only, and may change once building <br />designs are complete. <br /> <br />Impervious surface on the campus currently represents approximately 951,390 <br />square feet With proposed improvements, impervious surface will increase to <br />1,070,521 square feet Existing impervious surface in Roseville is approximately <br />436,235 square feet, increasing to 495,060 square feet Approximate existing <br />impervious surface in Arden Hills is 515,155 square feet, increasing to 575,461 <br />square feet This is an overall 12.5 % increase in impervious surface. <br /> <br />The proposed improvements are expected to be phased in over the next 12 to 20 <br />years, As these capital improvements are made, related improvements for surface <br />water management, traffic, and parking will be made to accommodate student/faculty <br />enrollment growth. <br /> <br />Northwestern College Master Plan <br />PUD Application Report <br /> <br />5 <br /> <br />13529,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.