My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />AL <br />FACILITIES <br />DATA <br />Ass ssme t <br />THE PLANNINGCHARGE 0 I <br />erence for all projects implemented on campus <br />3) planning issues be inventoried, discussed, analyzed and resolved <br />in terms of the Facilities Master Plan <br />4) the College's planning goals as outlined in this report be reviewed <br />to insure their validity <br />5) the College's facility planner update plan elements, prepare/ <br />commission necessary studies and guidelines, review other consul- <br />tant studies, and guide development conformance with the Campus <br />Master Plan <br />6) the Campus Master Plan be considered as a working document that <br />is reviewed and updated as a continuous cycle <br />Operational <br />Issues, <br />Growth <br />Issues, <br />Trends <br />Q PF@@(@Zo off Thlom 9ftV <br />Academic <br />Goals, <br />Other <br />Goals <br />Q@ac7@0§@ 90410t oflgo <br />physkog FffloOfflas <br />Planning Cycle <br />NORTHWESTERN COLLEGE CAMPUS MASTER PLAN PARTNERS & SIRNY ARCHITECTS PAGE 1.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.