Laserfiche WebLink
PLANNING ISSUES & ANALYSES , III <br />5. Workshops performed in this area; tightness affects ability to make <br />optimum presentations; when workshop in session, shuts down <br />other activities. <br />6. Need to separate staff functions from student activities. <br />7. Every last bit of space used, but more effective room configuration <br />would provide better internal room layout and more functional. <br />Counseling 1. Staff 1 FT, 2 0.25 PT <br />2. Desire 3rd PT due to FTE increase; served 2270 of population.; norm <br />is 1670 at Christian Colleges. <br />3. Limited to 10-15 sessions due to facilities limitations. <br />4. Peak times for student need: post -holiday, before finals and before / <br />around end of school year. <br />Alumni 1. Location, location, location! <br />2. Confidentiality an issue with work study and others. Need for <br />institutional policy for conference room quantity, location and avail- <br />ability? <br />3. Consolidate with other areas? Gift Planning, PR, Alumni all <br />together? <br />4. Strong desire to be in Nazareth near traffic. <br />Gift Planning 1. Surplus of space <br />2. Consolidate with other <br />together? <br />areas? Gift Planning, PR, Alumni all <br />Public Relations 1. Currently using 5.5 offices with 6.5 staff; will increase to 8.0. <br />2. High traffic area with outside vendors. <br />3. Network wiring important; 600-700 print projects a year. <br />4. Total area could use conference room. <br />5. Consolidate with other areas? Gift Planning, PR, Alumni all <br />together? <br />Athletics 1. Concern if Riley Gym is converted to classroom and lab space. <br />Pressure of scheduling, availability and maintenance. <br />2. Parking a problem for events; location, not quantity. Could some <br />spaces be "open' for games; roughly 500 people attend football <br />games. <br />3. Viewing Room too small for teams; too big for coaches; "right -siz- <br />ing" of facilities. <br />4. Riley Gym primarily intramural and softball/ baseball practice; 39 <br />events scheduled. <br />5. Currently rent to church groups on weekends; closing Riley may <br />preclude this; is this a policy issue? Outreach? <br />6. Concessions clean, but no water; would like to replace, but ... <br />7. Concerns about use of outdoor fields; football practice on baseball <br />field; wear and tear; artificial turf a solution since natural turf does <br />not have enough time to re-establish itself. <br />NORTHWESTERN COLLEGE CAMPUS MASTER PLAN PARTNERS & SIRNY ARCHITECTS PAGE 3.14 <br />