My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATIONS <br />51 Provide a mid-size auditorium/ theatre in the music wing addi- <br />tion seating 500± persons. This would be a more efficient loca- <br />tion for 'black box' theatre, chapel "overflow", smaller concerts, <br />chapel alternatives, theatre productions, conferences, etc. than <br />using Maranatha auditorium (1500) or Nazareth Chapel (300). <br />This space could also be considered for rental use to produce <br />outside income. <br />52 Research ways to reduce overhead costs by reduction of waste, <br />more efficient use of present resources, student involvement in <br />the preservation of physical assets, and energy conservation mea- <br />sures (heat recovery, ground source heating and cooling, occu- <br />pancy sensors for lighting, etc.). All remodeling, additions and <br />additions shall consider USGBC (United States Green Building <br />Council) and LEED (Leadership in Energy and Environmental <br />Design) provisions for design and construction methods. Each <br />individual project shall be reviewed from a cost/ benefit analysis <br />perspective. <br />MISCELLANEOUS <br />53 In the College's 10 year Deferred Maintenance Plan, NWC was <br />compared to about 18 other schools. As an aid to continual <br />improvement by NWC, it would be beneficial to evaluate NWC's <br />strengths and weaknesses in comparison with the other schools <br />referenced. <br />54 Research and assess availability of grants, and discuss potential <br />approaches with assets and sister colleges. <br />55 Do a performance analysis in each of the college's departments <br />and streamline service. <br />56 Evaluate all services that the College produces and purchases, <br />compare them against the industry norms and standards (cost, <br />quality, life expectancy, etc), and make adjustments to improve <br />the College's position. <br />IMPLEMENTATION <br />57 As the College seriously develops its plans for expanding to 2400 <br />traditional student FTE, the time frame must be developed in <br />concert with, and in parallel with, the Capital Campaign for new <br />space. <br />NORTHWESTERN COLLEGE CAMPUS MASTER PLAN PARTNERS & SIRNY ARCHITECTS PAGE 5.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.