Laserfiche WebLink
Note: These cost projections need to be updated bi- <br />annually to reflect current true costs (inflation). <br />Buildings Buildings/Area <br />unit <br />Const <br />Cost <br />Cost Projections <br />soft Total Project Cost <br />Costs Nov 2003 Dollars <br />Community Life Center/General Function/Classroom (Phase 1) (phsng <br />10% prem) 45,000 GSF <br />6,750,000 <br />1,687,500 <br />8,437,500 <br />Community Life Center/General Functions/Classrooms (Phase 2) <br />35,000 GSF <br />5,250,000 <br />1,312,500 <br />6,562,500 <br />Music Addition <br />20,000 GSF <br />3,200,000 <br />800,000 <br />4,000,000 <br />Existing Music area(east) remodeling (Art and ?) <br />6,000 GSF <br />360,000 <br />90,000 <br />450,000 <br />General Academic/Science Building (half science, half academic) <br />48,000 GSF <br />8,400,000 <br />2,100,000 <br />10,500,000 <br />Greenhouse (integral to bldg) <br />500 GSF <br />125,000 <br />31,250 <br />156,250 <br />Nazareth Remodel Phase 1 (Phasing adds 30%) <br />60,000 GSF <br />5,100,000 <br />1,275,000 <br />6,375,000 <br />Nazareth Remodel Phase 2 (Phasing adds 30%) <br />60,000 GSF <br />5,100,000 <br />1,275,000 <br />6,375,000 <br />Renovate Powerhouse (academic + admin) <br />11,600 GSF(±) <br />1,160,000 <br />290,000 <br />1,450,000 <br />Sculpture I Music Terrace <br />- tbd <br />tbd <br />tbd <br />tbd <br />LibraryAddition <br />12,000 GSF <br />1,980,000 <br />495,000 <br />2,475,000 <br />Alumni Center <br />10,000 GSF (tbd) <br />1,550,000 <br />387,500 <br />1,937,500 <br />New Classroom/Office Building <br />30,000 GSF <br />4,200,000 <br />1,050,000 <br />5,250,000 <br />(demolish South Terrace Dorm) <br />200 Allowance per seat <br />60,000 <br />9,000 <br />69,000 <br />Fieldhouse (6 lane track, 4 tennis courts, ........) <br />51,200 GSF <br />6,144,000 <br />1,536,000 <br />7,680,000 <br />Ancillary Space (Offices, lockers, toilets, etc.) <br />8,000 GSF (tbd) <br />1,200,000 <br />300,000 <br />1,500,000 <br />Concessionary <br />750 GSF <br />131,250 <br />32,813 <br />164,063 <br />New Dormitory East- Phase 1 (adjacent to Knutson) <br />275 Beds ± <br />8,662,500 <br />2,165,625 <br />10,828,125 <br />New Dormitory East- Phase 2(adjacent to Knutson) <br />275 Beds ± <br />8,662,500 <br />2,165,625 <br />10,828,125 <br />New Dormitory Apt 2940 Snelling Infill <br />95 Beds ± <br />3,087,500 <br />771,875 <br />3,859,375 <br />Underground parking <br />35 Stalls ± <br />630,000 <br />157,500 <br />787,500 <br />Potential Purchase of Existing Apt Bldg(s) for Dorms <br />unknown Beds <br />tbd <br />tbd <br />tbd <br />Renovation Cost for Converting Apts <br />unknown Beds <br />tbd <br />tbd <br />tbd <br />Parking Facility East (exstg tennis) (1 level slab -on -grade) <br />250 Stalls ± <br />1,125,000 <br />281,250 <br />1,406,250 <br />1 Structured level <br />250 Stalls ± <br />3,500,000 <br />875,000 <br />4,375,000 <br />Parking Facility NW (UL for Maranatha event use) <br />125 Stalls ± <br />2,000,000 <br />500,000 <br />2,500,000 <br />Lower Level Maintenance Operations (LL) <br />12,000 GSF (verify) <br />1,440,000 <br />360,000 <br />1,800,000 <br />Physical plant functions <br />tbd per Eng Study <br />tbd <br />tbd <br />tbd <br />(central or per bldg?) (current central plant includes Maranatha, Nazareth <br />and Riley) <br />Subtotal Building Costs <br />79,757,750 <br />19,939,438 <br />99,697,188 <br />Sitework <br />Note: Sitework scope/cost projections to be verified w/ conceptual engineering design <br />unit <br />Const <br />Cost <br />soft <br />costs* <br />Total Project cost <br />in Nov 2003 Dollars <br />Construct'Mall' <br />160,000 SFAllowance <br />560,000 <br />140,000 <br />700,000 <br />Blue Room/President's Reception Courtyard <br />14,000 SFAllowance <br />84,000 <br />21,000 <br />105,000 <br />(relocate KTIS satellites) <br />Re-route road behind Riley Hall <br />1,400 LF <br />259,000 <br />38,850 <br />297,850 <br />Re-route road west of NewAcad/Science Bldg <br />400 LF <br />74,000 <br />11,100 <br />85,100 <br />Re-route road at athletic fields/entry <br />100 LF <br />18,500 <br />2,775 <br />21,275 <br />Community Life parking reconfiguration (north) <br />150 Stalls ± (Allowance) <br />225,000 <br />33,750 <br />258,750 <br />Community Life parking reconfiguration (south) <br />100 Stalls ± (Allowance) <br />150,000 <br />22,500 <br />172,500 <br />Relocate Athletic Fields <br />Football/Soccer (turf) <br />Baseball (turf, dirt sliding pits + mound) <br />All athletic fields Lump Sum <br />1,600,000 <br />240,000 <br />1,840,000 <br />Softball (dirt infield, turf outfield) <br />Field lighting <br />175;000 <br />26,250 <br />201,250 <br />Permanent bleachers, Press box <br />2,000 Allowance per seat <br />800,000 <br />120,000 <br />920,000 <br />Re -use exstg bleachers for baseball (?) <br />200 Allowance per seat <br />60,000 <br />9,000 <br />69,000 <br />Dug outs, fencing, goal posts, etc <br />1 Allowance <br />Tunnel re-configuration/re-location <br />1 Allowance <br />250,000 <br />37,500 <br />287,500 <br />Tunnel extensiuon from Riley to New Parking facility <br />300 11fAllowance <br />450,000 <br />67,500 <br />517,500 <br />Data line re -location <br />1 Allowance <br />250,000 <br />37,500 <br />287,500 <br />Utility Work (new, re -location, re -sizing) (water, sewer, elec) <br />1 Allowance <br />1,000,000 <br />150,000 <br />1,150,000 <br />Add storm water storage pond(s) (incl piping, etc.) <br />1 Allowance <br />650,000 <br />97,500 <br />747,500 <br />Re -size, re -locate storm storage ponds <br />1 Allowance <br />300,000 <br />45,000 <br />345,000 <br />Implement Master Landscape Plan <br />tbd <br />tbd <br />tbd <br />tbd <br />(plant materials, surfaces, walks, lighting, site furnishings, signage, etc.) <br />Subtotal Sitework Costs <br />6,905,500 <br />1,100,255 <br />8,005,725 <br />GRAND TOTAL (Site & Buildings) 86,663,250 21,039,6633 107,702,913 <br />NORTHWESTERN COLLEGE CAMPUS MASTER PLAN PARTNERS & SIRNY ARCHITECTS PAGE 6.4 <br />