Laserfiche WebLink
APPENDIX <br />12E add telecom and other systems <br />18 use the word "real estate" instead <br />19 add the word "Alternative" <br />28 Correct Maranatha # to be 1500 capacity. Chapel, <br />Marantha music wing to be an over flow for chapel <br />or a recital hall. Recommend maybe sound proofing <br />the carousels <br />35 add Horizontal wiring <br />42 "planned" <br />54 is similar to #28 - combine <br />56 add deferred maintenance plan <br />57 assets and sister colleges <br />64 "college," "committed," remove "of the" <br />Larry requested to discuss Item 14, the charge back system. <br />Larry explained the system is referring more about a rental <br />space type charge back. Hal recommended using the word <br />allocation; Develop a system for allocating space assets. <br />Next step for Larry will be to sit down and do a cost <br />analyze on the plan. <br />Motion was made to accept the proposed plan and preliminary <br />recommendation <br />Motion seconded. <br />Hal Miller thanked Larry for his services to Northwestern <br />College. Larry commented again on what a pleasure it was <br />to work with us. <br />Monica Groves closed in prayer. <br />Committee adjourned <br />Meeting adjourned <br />END OF MEETING MINUTES <br />NORTHWESTERN COLLEGE CAMPUS MASTER PLAN PARTNERS & SIRNY ARCHITECTS APP C.27 <br />