My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota P011LItion Control Agency <br />�� PrnCe.�i.iktj i��liitrte�rlit',� Lrri}iri..rttlt�Jat i:ii4t� ��t4iilJt� L`� L.I�I: <br />APPLICATION INSTRUCTIONS <br />for <br />MINNESOTA'S NPDES/SDS GENERAL STORMWATER PERMIT <br />for <br />CONSTRUCTION ACTIVITY <br />Submission of an application is notice that the owner and general contractor identified on the application <br />intend to be authorized by an NPDES/SDS permit issued for Stormwater discharges associated with a <br />construction activity in the State of Minnesota. <br />For Questions 1-3, please refer to the NPDES/SDS General Stormwater Permit for Construction Activity and the <br />Flowchart at the end of these instructions. <br />I . Indicate if a Stormwater Pollution Prevention Plan (SWPPP) has been prepared and the appropriate sections (a <br />through h of this question) have been addressed by answering "Yes" or "No". A SWPPP is a plan for Stormwater <br />discharge that includes erosion prevention measures and sediment controls that, when implemented, will decrease <br />soil erosion on a parcel of land and decrease pollution in receiving waters. This plan must be developed prior to <br />submitting a permit application. A sample plan and development tools are available on the U.S. Environmental <br />Protection Agency web page at httu://cfpub l.epa.,gov/nudes/stormwater/swppp.cfm <br />For section "'h" indicate if an Environmental Review has been completed if required, by answering "Yes" or "No" <br />or "NA". Environmental review looks at how a proposed project could potentially affect the environment and looks <br />at ways to avoid or minimize impacts before the project is permitted and built. Examples of categories that may need <br />an environmental review include residential development; industrial, commercial, and institutional facilities; and also <br />highway projects. For certain projects, environmental review is mandatory. For more details see the Guide lo <br />Nlinnesola Envirownewal Re viei-r Rules, Chapter 6. This can be found at <br />http://www.mnplan.state.mn.us/pdf/rull-Xuid3.pdf <br />2. Indicate if discharges to special waters have been <br />identified and addressed by answering "Yes" or "No" or <br />"NA" (not applicable) on the Permit Application. The <br />questions at the right can help in making this <br />determination. <br />Special waters have qualities that warrant extra <br />protection. A list of these special water categories can be <br />found in Appendix A of the permit. For information on <br />special waters near the project's area, see the Minnesota <br />Pollution Control Agency (MPGA) Web page at <br />http://www.pca.state.Mn.us/publications/wq-strm 1-05.xls <br />Special Waters <br />2.a. Do you have a `special water' that is within 2,000 <br />feet of the project? (see Appendix A of the Permil <br />for a list ofthese special water calegories) <br />2.b. Do you have stormwater discharges that are within <br />2,000 feet of these special waters? <br />2.c. Will the discharges identified in 2.b. flow to the <br />special waters? <br />wq-strm2-58 Rmsed 11/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.