Laserfiche WebLink
3. Indicate by answering "Yes" or "No" whether the project will include alternative methods for the permanent <br />Stormwater management system or will disturb 50 acres or more and have a discharge point (including sheet flow) that <br />is within 2000 feet of and flows to an impaired or special water. Additional review from the MPGA is required in these <br />cases. <br />Yon have the option of proposing an alternative, innovative, permanent Stormwater management system. YOU must send <br />in the permit application and the additional required information (see Part 111,0.5 of the Permit) at least 90 days prior to <br />the start of construction if you choose this approach. You must receive an approval letter from [lie MPCA for this method <br />before beginning construction. <br />The application and SWPPP need to be submitted to the IVIPCA a minimum of 30 clays prior to the start of construction if <br />the project disturbs 50 acres or more and drains to an impaired water or a special water listed in Appendix A of the <br />permit. For a list and maps of impaired waters in MN go to www.pca.state.mn.us/water/trndl.html <br />4. The application requires a S400 application fee. Indicate that the application fee has been enclosed by answering ""yes" <br />Please make checks payable to: Minnesota Pollution Control Agency and submit the check with the completed <br />application to: MPCA, Regional Environmental Management Division, 520 Lafayette Road North, St. Paul, MN 55155- <br />4194. Applications received without the required fee will be returned to the sender. <br />5. List the construction project's name. If the project does not have a name, list the type of project and a brief description <br />(for example, "I -35E/1-494 Interchange" or "Highway 169 bridge replacement (#79605) at the Rum River"). <br />6. Provide an address (if available) and brief description of the construction activity's location (for example, "North West <br />Corner of the Intersection of 45"' Street and Irving Avenue, Minneapolis, MN-). <br />List the County Parcel ID# for the project if it is known. If there are multiple numbers within the project, attach a list. <br />Parcel identification Numbers are unique numbers assigned by the County. Listing the County Parcel 1D4 is not required <br />if not available (for example, highway projects) <br />Provide the names of all Cities, counties, and townships the construction activity takes place in (for example, a roadway <br />may cross county, city, or township boundaries). <br />7. List, in acres, the amount of area to be disturbed for this project. <br />8. Attach the required map and indicate that it is included with the permit application. United States Geological Survey <br />(USGS) 7,5 -minute quad maps or equivalent maps may be used. <br />USGS 7.5 -minute quad maps may be ordered at http://store.usQS.gov/ <br />9. Indicate the type of construction activity by checking the appropriate box. Please describe the project if you check <br />"Other". <br />10. Indicate to the nearest quarter acre, the existing and resulting areas of impervious surfaces. Impervious surface means a <br />constructed hard surface that either prevents or retards the entry of water into the soil and causes water to run off the <br />surface in greater quantities and at an increased rate of flow than prior to development. Examples include rooftops, <br />sidewalks, patios, driveways, parking lots, storage areas, and concrete, asphalt, or gravel roads. (a.) "Existing" area means <br />the area of impervious surface that is present prior to the start of this construction project. (b.) "Post construction" means <br />the entire area of impervious surface after construction is completed. Subtract (a.) from (b.) to determine the area of new <br />impervious swrface. <br />1 I. For projects creating one or more acres of cumulative new impervious surfaces, check the appropriate box to indicate <br />which type(s) of permanent Stormw2ter management practices that will be used. The "Other" box is limited to those <br />situations (such as proximity to bedrock) that are described in Part I11.0 of the permit. See the permit for a further <br />description. 1f the "Other' box is checked, describe which situation outlined in Part 111. C. tits the project and what other <br />permanent treatment (such as grassed swales, smaller ponds and/or grit chambers) will be used on the project. <br />12. BRIEFLY describe which waterbody(s) will receive Stormwater runoff from the construction site or from the discharge <br />from permanent Stormwater management systems by completing the table. To determine which waterbody(s) will <br />wq-strm2-58 Revised 1 P06 <br />