My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 26 <br />Permit No: MN R 100001 <br />of development or sale that will ultimately disturb one (l) or more acres must submit a <br />completed application to the MPCA. <br />b. For certain projects or common plans of development or sale disturbing 50 acres or more, <br />the application must be submitted at least 30 days before the start of construction activity. <br />This requirement pertains to projects that have a discharge point on the project that is within <br />2000 feet of, and flows to, a special water listed in Appendix A, Part B. or waters listed as <br />impaired under section 303(d) of the federal Clean Water Act (see MPCA's web site). <br />Applicants must submit a completed application form and Storm Water Pollution <br />Prevention Plan including all calculations for the Permanent Storm Water Management <br />System (see Part III.A — Q. <br />The Owner and Operator are Permittee(s). The owner who signs the application is a <br />Permittee and is responsible for compliance with all terms and conditions of this permit. The <br />operator (usually the general contractor) who signs the application is a Permittee for Parts <br />I1.B., Part II.C. and Part IV. of this permit and is jointly responsible with the owner for <br />compliance with those portions of the permit. <br />3. Permit Coverage. The commencement of any construction activity (e.g., land disturbing <br />activities) covered under Part I.A. of this permit is prohibited until permit coverage under this <br />permit is effective or, if applicable, until the MPCA has issued an individual NPDES/SDS <br />construction storm water permit for the project. <br />a. Except as provided in subp. 3.b. and 3.c. below, permit coverage will become effective seven <br />7 days after the postmarked date of the completed application form. <br />For projects disturbing 50 acres or more, that have a discharge point on the project that is <br />within 2000 feet of, and flows to, a special water listed in Appendix A, Part B. or waters <br />listed as impaired under section 303(d) of the federal Clean Water Act, the applicants must <br />submit a completed application and SWPPP to the MPCA at least thirty (30) days prior to the <br />commencement of construction activities. MPCA staff will review the SWPPP submitted <br />with the completed application and unless the Permittee is notified in writing that the <br />SWPPP does not meet the general permit requirements, permit coverage will become <br />effective 30 days after the postmarked date or MPCA date -stamp (whichever is first) of the <br />completed application. <br />c. For proposals to use Alternative Method(s) for the Permanent Storm Water Management <br />System under Part III.C.5, the applicants must submit a completed application and SWPPP, <br />including the Alternative Method documentation under Part III.C.5, to MPCA for review and <br />approval at least 90 days prior to the proposed starting date of construction activity. <br />i. The MPCA will notify the applicant within the 90 -day period, in writing, whether the <br />alternative method is approved or not approved and, if applicable, the basis for <br />denial. <br />ii. The applicant may re -submit the alternative method after addressing the MPCA's <br />basis for denial. The MPCA will respond within 30 days. <br />Ili. Permit coverage will become effective upon receipt of an alternative treatment <br />method approval letter from MPCA. Any construction activity on the project is not <br />covered under this permit until receiving the alternative treatment approval letter. <br />wq-strm2-5 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.