Laserfiche WebLink
Page 6 of .26 <br />Permit No: NlN 8100001 <br />4. Coverage Letter. For projects under subpart 3.a. of this part, the Perm. Wee(s) will receive a <br />permit letter and certificate acknowledging perrnit coverage, usually within 30 days of the <br />postmarked date of the completed application. <br />Change of Coverage. For storm water discharges from construction projects where the owner or <br />operator changes, (e.g., an original developer sells portions of the property to various <br />homebuilders) the new owner or operator must submit a subdivision registration within 7 days <br />of assuming operational control of the site, commencing work on their portion of the site, or of <br />the legal transfer, sale or closing on the property. For instances where an owner or operator of <br />an entire project changes after an application has been submitted under Part 11, the new owner or <br />operator must submit an application for permit transfer/modification within 7 days of assuming <br />control of the site or commencing work on-site, or of the legal transfer, sale or closing on the <br />property. Late submittals will not be rejected; however, the MPCA reserves the right to take <br />enforcement for any unpermitted discharges or permit noncompliance for the new registered party <br />that has assumed control of the site. For storm water discharges from construction activities <br />where the owner or operator changes, the new owner or operator can implement the original <br />SWPPP created for the project or develop and implement their own SWPPP. Permittee(s) shall <br />ensure either directly or through coordination with other Permittee(s) that their SWPPP meets <br />all terms and conditions of this permit and that their activities do not render another party's <br />erosion prevention and sediment control Best Management Practices (BMPs)." <br />C. TERMINATION OF COVERAGE <br />1. Permittee(s) wishing to terminate coverage under this permit must submit a Notice of <br />Termination (NOT) to the MPCA. Compliance with this permit is required instil a NOT is <br />submitted. The Permittee(s) authorization to discharge under this permit terminates at midnight <br />of the day the NOT is signed. <br />2. All Permittee(s) must submit a NOT within thirty (30) days after one or more of the following <br />conditions have been met: <br />a. Final stabilization (see Part W.G. and definition in Appendix B ) has been achieved on all <br />portions of the site for which the Permittee is responsible (including the removal of all <br />temporary measures such as silt fence, and if applicable, returning agricultural land to its pre - <br />construction agricultural use); <br />b. Another owner/operator (Permittee) has assumed control according to Part II.B.5 over all <br />areas of the site that have not been finally stabilized; or <br />c. For residential construction only, temporary erosion protection and clown gradient <br />perimeter control for individual lots has been completed and the residence has been <br />transferred to the homeowner. Additionally, the Permittee must distribute the MPCA's <br />"homeowner factsheet" to the homeowner to inform the homeowner of the need for, and <br />benefits of, final stabilization. <br />3. Permittee(s) that use an alternative method for the permanent storm water management system <br />as described in Part III.C.5, are prohibited from terminating this permit until final stabilization <br />has been achieved on site and either: <br />wq-strm2-5 I <br />