My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table No. 3: <br />Estimated College Master Plan Trip Distribution <br /> Fairview Ave Snelling Ave I-35W <br />Lydia <br />Ave CR - C-2 Co. Rd. C <br /> North South North South North South East East East West Total <br />Commuter Students 5.4% 8.3% 15.7%31.4%24.1%5.6% 4.4% 1.4% 2.3% 1.4%100.00% <br />College Staff/Emp's 7.2% 6.8% 15.3%22.6%26.9%5.1% 9.9% 2.2% 2.4% 1.6%100.00% <br /> <br />Table No. 4: <br />Year 2018 Levels of Service and <br />Average Vehicle Delays with No Roadway Improvements <br /> 2018 Background Conditions 2018 Cumulative Conditions <br /> AM Peak <br />Hour <br />PM Peak <br />Hour <br />AM Peak <br />Hour <br />PM Peak <br />Hour <br />Fairview Ave/Lydia Ave <br />Overall LOS/Average Delay <br />(seconds) B - 15 C - 20 C - 18 D - 35 <br />Worst Approach LOS/Delay <br />(seconds) SB - C - 16 NB - C - 23 SB - C - 22 SB - E - 41 <br />Lydia Ave/College Entrance <br />Overall LOS/Average Delay <br />(seconds) A - 3 C - 18 A - 6 F - 150 <br />Worst Approach LOS/Delay <br />(seconds) SB - C - 18 SB - F - 61 NB - E - 39 SB - F - 465 <br />Snelling Ave/Lydia Ave <br />Overall LOS/Average Delay <br />(seconds) E - 55 F - 90 E - 55 F - 87 <br />Worst Approach LOS/Delay <br />(seconds) SB - E - 70 NB - F - 124 SB - E - 69 WB - F - 142 <br />Snelling Ave/County Road C-2 <br />Overall LOS/Average Delay <br />(seconds) B - 10 E - 64 B - 11 E - 64 <br />Worst Approach LOS/Delay <br />(seconds) WB - E - 63 NB - F - 100 WB - E - 64 NB - F - 100 <br /> <br /> <br /> <br />Northwestern College Master Plan 15 13529.000 <br />Traffic and Parking Impact Study
The URL can be used to link to this page
Your browser does not support the video tag.