My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ai ~'" <br /> <br />7. Typically, Walgreen's installs a neon mortar and pestle sign on the inside <br />back wall of entry tower. Walgreen's has agreed to soften this by replacing <br />this sign with a decal graphic ofthe mortar and pestle applied to the back wall, <br />and illuminated by the lights within the tower. <br />8. Our exterior lighting consultant indicates that the parking lot lighting will be a <br />"white" light that is used almost universally in new retail centers. High <br />Pressure Sodium lights are discouraged because they are not as safe and <br />distort colors. <br />9. Pope Associates calculated the pervious green areas of each building pad. The <br />results are: <br />a. Walgreen's Pad: 28.5% <br />b. East Central Pad: 23.6% <br />c. South Pad: 18.2% <br />d. Existing Retail Pad: 27.4% <br />Overall, the PUD site exceeds the 25% minimum. <br /> <br />Let me know if you need additional information for the next Plarming <br />Commission meeting. <br /> <br />Very truly yours <br /> <br />Denny Trooien <br />
The URL can be used to link to this page
Your browser does not support the video tag.