Laserfiche WebLink
<br />Ms. Kristine Giga <br />October 8. 2007 <br />Page 6 <br /> <br /> <br /> <br />Jennifer Brekken, Environmental Engineer Project Engineer <br />Jennifer reccntly joined Barr with more than four years of experience in the <br />investigation and remediation of MOP sites and a master's degree in civil <br />engineering from the University of Minnesota. Her field experience includes <br />conducting and supervising air, water, and soil sampling and managing site <br />remediation and redevelopment. Jennifer has developed numerous work plans, <br />site evaluations, risk assessments, and remediation plans. Since joining Barr she <br />has assistcd with thc NWQ projcct in New Brighton (sec project example), <br />including site assessments and investigations, and response action plan <br />development. <br /> <br /> <br />Jennifer will assist Sara on the project in reviewing documents, reviewing <br />guidance and regulations and deliverable production. Jennifer's billing rate is <br />$90/hr. <br /> <br />Alec Danielson, Environmental Engineer Field Engineer <br />Alec began working for Barr as an environmental engineering intern. He <br />completed a degree in geological engineering and geology from the University of <br />Wisconsin-Madison in December 2005 and has worked at Barr full time since <br />graduation. Alec's project work at Barr includes performing fieldwork activities <br />including soil and water sampling, screening and classification, construction <br />oversight, serving as health and safety leader, supervising trenching and pipe <br />installation, and survey activities. <br /> <br />Alex is an example of Barr staff that will be available to help the City with any <br />fieldwork that becomes associated with the redevelopment project (e.g., <br />inspecting contaminated-soil excavations to create clean utility corridors and <br />inspecting the installation of future City-owned utilities being constructed by the <br />developer). Alex's billing rate is $70/hr. <br /> <br />We look forward to helping Arden Hills achieve a successful redevelopment of the TCAAP transfer <br />property and we arc excited about working with you on this project. If you have any questions, please <br />call either of us. <br /> <br />?ice!/ <br /> <br /> <br />~J<e hard, P.E. <br />Sr. Vice President <br />952-832-2725 <br /> <br /> <br />~q <br /> <br />Project Manager <br />952-832-2935 <br />