My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-29-07 Item 7C, Env Characterization Contractor for TCAAP Property
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
10-29-07-R
>
10-29-07 Item 7C, Env Characterization Contractor for TCAAP Property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2007 2:18:13 PM
Creation date
10/24/2007 2:14:55 PM
Metadata
Fields
Template:
General
Document
Item 7C TCAAP Env Characterization
General - Type
Agenda Item
Date
10/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br /> <br />~ <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />October 25,2007 <br /> <br />AGENDA ITEM 7.C. <br /> <br />TO: <br /> <br />Mayor and City Council <br />Michelle Wolfe, City Administrator ~ <br /> <br />Kristine Giga, Civil Engineer V&--\~ <br />Deb Bloom, City Engineer <br />Greg Hoag, Public Works Director$- <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Motion to Authorize Staffto Contract with Barr Engineering <br />Company for the Review ofthe Environmental Characterization of <br />the TCAAP property <br /> <br />BACKGROUND <br /> <br />The City of Arden Hills approved an engineering consultant pool on August 27,2007 for use on more <br />specialized projects or projects that the City of RoseviUe's Engineering Department may not have the <br />capacity to assist with. <br /> <br />As part of the TCAAP redevelopment, the Developer is preparing environmental documents <br />characterizing the site. These documents, the Remedial Investigation (Rr) reports and Remedial Action <br />Plan (RAP), are of a technical nature such that the City of Roseville Engineering Department does not <br />have the expertise to review and analyze the documents. Therefore, a request for quotes was submitted to <br />the City's miscellaneous engineering pool, consisting of the following three firms: Barr Engineering, <br />Bonestroo, and URS Inc. All three firms provided quotes for the proposed work. <br /> <br />DISCUSSION <br /> <br />The scope of the contract includes: 1) Review of the R1 and 2) Review of the RAP. Each of the firms <br />expanded on this to include additional time for project management and/or background discussions <br />with the City to familiarize the consultant team with the project. The following table summarizes the <br />costs submitted by each firm. <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Engineering\2007\Council_ Actions\] Q-29-07Memo _ EnvCharacter _ deb.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.