My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-07 Item 4C Civil Eng Tech Support Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
12-10-07-R
>
12-10-07 Item 4C Civil Eng Tech Support Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2007 3:35:32 PM
Creation date
12/6/2007 3:28:58 PM
Metadata
Fields
Template:
General
Document
Item 4C Civil Engineering Tech Support
General - Type
Agenda Item
Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />engineer responsible for managing the public infrastructure improvements for the 100-acre <br />Heritage Park Redevelopment Project in the City of Minneapolis. <br /> <br />Nancy Frick, AICP - Senior Associate <br />Nancy brings 20 years of city planning and 10 years of environmental planning experience to <br />the challenge of balancing community development with protection of social and nature <br />resources and engaging stakeholders in the exciting work of managing change. Nancy <br />continues her on-going responsibility for securing state environmental clearance for the Ryan <br />Companies redevelopment proposal of the TCMP site through the Alternative Urban <br />Areawide Review (AUAR) process. <br /> <br />Todd Polum, PE - Senior Associate <br />Todd has more than 10 years of experience in transportation engineering and is well-regarded <br />as an expert in traffic operations analysis and interchange operations from both a regional and <br />local system perspective. He has developed unique solutions that benefit both the local and <br />regional system. Todd is currently responsible for review and comment of the traffic analysis for <br />the TCMP site on behalf of the City of Arden Hills and input into the AUAR documentation. <br /> <br />Lisa Goddard, PE - Senior Associate <br /> <br />Lisa has more than 10 years of experience with SRF in drainage design, permitting, <br />hydrologic/hydraulic modeling and design activities, including extensive use of XP-SWMM <br />modeling software. She worked on the initial hydrologic study for the TCMP master plan. <br />Other highlights of Lisa's career include the planning and implementation of innovative and <br />integrated stormwater management plans for the TCF Bank Stadium and Heritage Park <br />Redevelopment in Minneapolis. <br /> <br />Steve Miller, PE - Associate <br /> <br />Steven has 13 years experience in municipal engineering and over 10 years previous experience <br />in construction. His background includes a diverse mix of commercial and residential <br />developments involving street and utilities from feasibility reports to final design through <br />construction. Steven was responsible for the existing and proposed utility analysis for the <br />Framework Vision Conceptual Master Plan for the TCAAP site in the City of Arden Hills in 2002. <br /> <br />Craig Vaughn, PE - Associate <br />Craig, an expert in many areas of traffic and transportation engineering, has eight years of <br />experience and regularly contributes to a number of traffic and transportation projects. His skill <br />set includes detailed traffic operations analysis, high level transportation planning, and effective <br />project management and public involvement. Some of his recent projects include the <br />Normandale Lakes District Area Plan in Bloomington, the Richfield Comprehensive Plan <br />Update in Richfield, the Twin Lakes Business Park AUAR in Roseville, the review of the <br />Northwestern College Traffic Study in Roseville, and the review of the Aden Plaza Traffic Study <br />in Arden Hills. <br />
The URL can be used to link to this page
Your browser does not support the video tag.