My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-07 Item 4C Civil Eng Tech Support Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
12-10-07-R
>
12-10-07 Item 4C Civil Eng Tech Support Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2007 3:35:32 PM
Creation date
12/6/2007 3:28:58 PM
Metadata
Fields
Template:
General
Document
Item 4C Civil Engineering Tech Support
General - Type
Agenda Item
Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br /> <br />~ <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />December 6, 2007 <br /> <br />AGENDA ITEM 4.C. <br /> <br />TO: <br /> <br />Mayor and City Council <br />Michelle Wolfe, City Administrator <br /> <br />Kristine Giga, Civil Engineer ~ <br />Deb Bloom, City Engineer <br />Greg Hoag, Public Works Director <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Motion to Authorize Staffto Contract with WSB & Associates, Inc. to <br />Provide Civil Engineering Technical Support for the Redevelopment <br />of the TCAAP property <br /> <br />BACKGROUND <br /> <br />The City of Arden Hills approved an engineering consultant pool on August 27,2007 for use on <br />specialized proj ects or projects that the City of Roseville' s Engineering Department may not <br />have the capacity to assist with. <br /> <br />As part ofthe TCAAP redevelopment, the Developer will be preparing engineering plans, <br />reports and other documents for City staffto review. While the City ofRoseville Engineering <br />Department will be able to perform much ofthe review, staff feels that it will be beneficial to <br />have a consultant on board to provide additional support for review of more technical aspects of <br />the redevelopment, such as overall water and sanitary sewer system capacity analysis. <br />Therefore, a request for quotes was submitted to the City's planning pool, consisting ofthe <br />following firms: Kimley-Hom and Associates, Inc., SRF Consulting Group, Inc., URS <br />Corporation, and WSB & Associates, Inc. All four firms provided quotes for the proposed work. <br /> <br />DISCUSSION <br /> <br />The support to be provided with this contract includes, but is not limited to: review oftechnical <br />documents such as water system plans, sanitary sewer layouts, traffic analyses, storm sewer <br />plans. Meetings with City staff will occur on an as needed basis. Staff estimates that an average <br /> <br />\\Metro~inet.us\ardenhins\PR&PW\Engineering\2007\Council_ Actions\12-1 Q-Q7Memo _ TCAAPsupport.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.