My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-07 Item 4C Civil Eng Tech Support Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
12-10-07-R
>
12-10-07 Item 4C Civil Eng Tech Support Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2007 3:35:32 PM
Creation date
12/6/2007 3:28:58 PM
Metadata
Fields
Template:
General
Document
Item 4C Civil Engineering Tech Support
General - Type
Agenda Item
Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"-- r;> <br /> <br />URS <br /> <br />November 27,2007 <br /> <br />Ms. Kristine Giga, P.E. <br />Civil Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: Proposal for Professional Services <br />Technical Support for Twin Cities Army Ammunition Plant (TCAAP) <br /> <br />Dear Kris; <br /> <br />Thank you for the opportunity to submit this proposal for technical support related to the ongoing TCAAP <br />development process. We have outlined our understanding of the project, our proposed key personnel and <br />hourly rates for the work below. <br /> <br />PROJECT UNDERSTANDING <br /> <br />We understand that you are seeking professional services to assist City staff with the technical review of water <br />system plans, sanitary sewer system plans, storm sewer system plans as well as traffic analyses. Based upon <br />your RFP, we anticipate our efforts to include reviewing plans prepared by the developer's consultants and <br />providing written comments, recommendations or technical questions associated with the system plans to be <br />addressed by the developer. The anticipated time commitment is approximately 4 hours per week through <br />March 31, 2008 with the potential for extension through the end of 2008 at the request of City Staff. <br /> <br />KEY PERSONNEL <br /> <br />Lead Contact for City: <br />Greg Brown will serve as the main point of contact for City staff for these services. He will provide overall <br />project management and see that the needs of the City are met within the established schedule. <br /> <br />Sanitary Sewer, Water Distribution, Storm Sewer Plan Reviews: <br />We have identified three individuals to provide expertise in this area as appropriate. <br /> <br />Greg Brown, PE <br />Greg leads the URS Roadway and Infrastructure group and brings nearly twenty years of experience <br />associated with preliminary and final utility and stormwater design to the City's TCAAP review team. Greg's <br />resume includes the development of masterplans for watermain, sanitary sewer and storm sewer for the 540 <br />acre Arbor Pointe development in Inver Grove Heights, a development very similar in scale to the proposed <br />TCAAP development. In addition, Greg has superior knowledge of utility and drainage infrastructure <br />throughout Arden Hills including the TCAAP property as a result of providing City Engineering and <br />infrastructure planning services from 1997 to present. Greg's experience includes the design of CSAH 96 <br />roadway, storm sewer and watermain improvements that directly interface with the TCAAP development. <br /> <br /> <br />Thresher Sqllare' 700 Third St'~ef SOllth . SlIite 600. Millll,o!,o!is. MN 55415' Pholle: (612) 370-0700' Fax: (612) 370-1378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.