Laserfiche WebLink
<br />URS <br /> <br />Ms. Kris Giga, PE <br />November 27,2007 <br />Page 2 <br /> <br />Frank Ticknor, PE <br />Prank is a senior civil engineer within the Roadway and Infrastructure group of URS and brings eight years of <br />experience associated with preliminary and final utility and stormwater design to the City's TCAAP review <br />team. Prank is also intimately familiar with Arden Hills' utility and drainage infrastructure as a result of his <br />experience with providing planning and engineering services to Arden Hills from 2000 to present. Frank was <br />responsible for managing the lift station rehabilitation program including the design and upgrade of 10 lift <br />stations. <br /> <br />Joel Toso, PE (see attached resume) <br />Joel recently joined URS and brings over twenty years of unique expertise in the areas of stormwater system <br />design and modeling as well as water distribution and sanitary sewer system design. Joel will offer a fresh <br />perspective on storm water management from both a quality and quantity point of view. Joel's career has <br />focused on leading edge techniques for modeling and designing of water resources improvements. Joel will be <br />able to quickly assess the accurateness and appropriateness of developer masterplans and models related to <br />storm water, potable water supply and sanitary sewer improvements. <br /> <br />Traffic Analyses: <br /> <br />John Crawford, PE, PTOE <br />John leads the URS Traffic Engineeling group and brings over fifteen years of experience with traffic <br />engineering, travel demand modeling and transportation planning to the City's TCAAP review team. He has <br />recently conducted a traffic impact analysis for a similar 600-acre development in Hassan Township, just north <br />of Maple Grove. John understands the range of traffic issues associated with the TCAAP property, <br />specifically how the location and design of perimeter access nodes to the property impact existing travel <br />patterns and traffic levels on CSAH 96, TH 10, I35W and County Road 1. John will be able to evaluate trip <br />generation methods, review and run traffic models prepared by the developer and quickly assess whether they <br />have accounted properly for existing and proposed conditions. <br /> <br />FEE SCHEDULE <br /> <br />The following are the proposed hourly rates for the individuals listed in this proposal. These rates will be used <br />from the start of the project through the end of 2008. <br /> <br />Greg Brown, PE <br />Prank Ticknor, PE <br />Joel Toso, PE <br />John Crawford, PE, PTOE <br /> <br />$135.00/hr <br />$ 85.00/hr <br />$140.00/hr <br />$120.00/hr <br /> <br /> <br />