My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-07 Item 4C Civil Eng Tech Support Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
12-10-07-R
>
12-10-07 Item 4C Civil Eng Tech Support Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2007 3:35:32 PM
Creation date
12/6/2007 3:28:58 PM
Metadata
Fields
Template:
General
Document
Item 4C Civil Engineering Tech Support
General - Type
Agenda Item
Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />-A~HILLS <br /> <br />Kimley-Hom has strong working relationships with other consultants <br />currently working on the TCAAP site. We have recently worked with the <br />developer's planning consultant, Hoisington Koegler Group, Inc., (HKGi) <br />on other local development/redevelopment projects in Maplewood and <br />Chanhassen. We are currently working with the City's environmental <br />review consultant, Barr Engineering, on projects in the Northwest <br />Quadrant area of New Brighton and on projects for the City of Inver <br />Grove Heights. <br /> <br />Technical Reviews <br /> <br />We understand that the City is seeking a consultant to review technical <br />documents including water system plans, sanitary sewer layouts, traffic <br />analyses, and storm sewer plans. The Kimley-Hom teams brings to the <br />City of Arden Hills solid experience in each of these areas as represented <br />in our individual staff resumes included in the Statement of Qualifications <br />submitted this past June as well as the attached project examples. <br /> <br />As a part of water system plan review, we would verify that the <br />developer's design meets current City of Arden Hills and Department of <br />Health standards, provides adequate looping and water main sizing, <br />includes valves at appropriate locations for system operation and isolation, <br />and incorporates adequate hydrant spacing to ensure fire protection <br />standards are met. <br /> <br />When reviewing sanitary sewer system layouts, we would ensure that the <br />design complies with current City and Metropolitan Council <br />Environmental Services (MCES) standards. Through providing <br />redevelopment services to other local communities, we understand the <br />need to coordinate with MCES when providing new connections to or <br />modifying flows contributing to the MCES collection system. We also <br />have experience in the preparation of Comprehensive Sanitary Sewer Plan <br />updates as may be necessary to address additional flows generated by new <br />development/redevelopment. <br /> <br />Traffic analysis and construction plans would be reviewed to verify <br />consistency with the AUAR as well as applicable City, Mn/DOT, and <br />County standards and policies. These reviews are recommended for any <br />site specific traffic impact studies, Intersection Control Evaluation reports, <br />and site development or roadway construction plans. Our staff will review <br />the methodology used in the traffic analyses to make sure reasonable <br />traffic growth rates, trip generation, and analysis inputs are used to ensure <br />appropriate mitigation measures are recommended and implemented. Site <br /> <br />lIII"""l_n Kimley-Hom <br />1lIo...I_ U and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.