Laserfiche WebLink
<br />Arden Hills at least two weeks prior to construction to include in the Northwestern College <br />address file. <br />12. Lake Setbacks. Except for walkways, no impervious surfaces shall be constructed within <br />the 50 feet of the ordinary high water mark for Lake Johanna and 75 feet from the ordinary <br />high water mark for Little Lake Johanna. The use of pervious surfaces for walkways shall be <br />encouraged. <br />13. Property Setbacks. All structures, including parking ramps, and roads shall be at least <br />seventy-five (75) feet from the eastern property line and thirty (30) feet from the western <br />property line. <br />14. Buildin!! Hei!!ht. Any building exceeding the height limit of the underlying R-1 Zone shall <br />require an approved height variance prior to construction. <br />15. Li!!htin!!. Lighting from any new or remodeled structures, parking lots, roads, vehicular <br />traffic, or other campus features shall be prohibited from shining directly onto adjacent <br />properties and shall not exceed the lighting limitations in the Arden Hills Zoning Code. <br />16. Lot Covera!!e. The portion of the campus within Arden Hills shall not exceed 35 percent lot <br />coverage without an approved variance or PUD amendment as required by the Zoning Code <br />at the time of review. The lakes shall not be included in the lot coverage calculations. <br />17. Tree PreservatIon. A tree preservation plan shall be submitted with each site plan review <br />and shall be in compliance with any current and future tree preservation standards. <br />18. Buckthorn Removal. The College shall continue to implement a buckthorn removal <br />program to protect the native landscaping in and around the College's property. <br />19. Trash/RecvclinldRefuse Handlin!!. All trash, recycling, and other refuse handling shall be <br />in conformance with Section 620.04 of the City Code and as amended in the future. <br />20. Storm water Mana!!ement. The College shall be required to conform and implement the <br />following as a part of their storm water management plan for this development: <br />a. Each development phase must meet the regulatory standards in place at the time of <br />building permit application. All stages of development should recognize the others to <br />ensure that a comprehensive storm water management plan is constructed for the site. <br />b. Site impervious coverage shall be consistent with the provisions of City Zoning and <br />Shoreland Ordinances. <br />c. The College will identify and eliminate all direct, untreated piped discharges into <br />Lake Johanna and Little Lake Johanna as a part of the campus expansion plans. <br />21. Ener!!v Efficient Desi!!n. Each phase shall use as many Leadership in Energy and <br />Environmental Design (LEED) principles as the College deems possible. <br />22. City of Roseville Conditions. The Master Plan shall be subject to all conditions and <br />regulations set by the City of Roseville. Conditions imposed by the City of Arden Hills shall <br />not be deemed to invalidate any conditions set by the City of Roseville. <br />23. Environmental Review. The City of Arden Hills reserves the right to request an updated <br />environmental assessment with future construction and site plan review processes. <br />24. Landscapin!! Laverin!! and Li!!ht Buffer. Landscape screening shall take a multi-layered <br />landscape approach and shall be required to prohibit lights from shining onto adjacent <br />properties. <br />25. Rin!! Road and Parkin!! Structure Landscapin!!. Landscaping plans shall be substantially <br />sirnilar in size and quality as in attached Exhibit A of the POO permit for parking garage and <br />ring road and subject to site plan review. <br /> <br />\\Metro-inet.us\ardenhills\PlanninglPlanning Cases12006\06-037 Northwestern College Master Plan (PENDING)\121007 - CC Report - Final <br />PUD Permit - NWC.doc <br /> <br />Page 3 of4 <br />