My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4K
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
01-14-08-R
>
4K
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2008 8:44:24 AM
Creation date
1/16/2008 8:40:39 AM
Metadata
Fields
Template:
General
Document
City Hall Repairs Project Manual
General - Type
Agenda Item
Date
1/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br /> <br />~ <br />~. <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />January 14, 2007 <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Dave Scherbel, Building Official <br /> <br />SUBJECT: <br /> <br />City Hall Repairs <br /> <br />Background <br />At the August 20, 2007, worksession, staff and Brian Pashina from Wiss, Janey, Elstner, Inc. <br />(WJE) were present to discuss future possible repair work to the Arden Hills City Hall Building. <br />At the meeting, WJE identified four areas of concern. Below are those options presented to <br />Council. <br /> <br />City Hall Repair Options: <br /> <br />1. Replace through-wall flashing at both levels at base of wall and install sheet metal <br />cap at concrete masonry foundation ledge (along south and east foundation walls.) <br />2. Replace through-wall flashing above windows on south side of building. <br />3. Clean and paint relieving angles, and replace through-wall flashing. <br />4. A) Increase maintenance through routine inspection of coping stones and joints, <br />replacement of failed sealant, and resetting coping stones as required which become <br />damaged by movement. <br />B) Remove and replace existing coping stones with proper overhang with drip and <br />through-wall flashing. <br /> <br />At that worksession, Council's recommendation was to defer Items 1 and 2, obtain bids for Item <br />3, and quotes for Item 4. <br /> <br />In preparation for going out to bid, staff has received a proposal from WJE to prepare a project <br />manual and bid documents for item 3 above. Attached is a copy of that proposal. <br /> <br />Recommendation <br />City staff requests authorization to have WJE prepare a project manual for cleaning, painting, <br />and replacement of the through-wall flashing at the relieving angles. Staff also requests <br />authorization to have WJE prepare coping repair details and obtain estimates for item A and B <br />above. Total cost for the above is $22,000. <br /> <br />\\Metro-inet.us\ardenhills\Building\Memos\City ball future repairs.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.