My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4K
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
01-14-08-R
>
4K
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2008 8:44:24 AM
Creation date
1/16/2008 8:40:39 AM
Metadata
Fields
Template:
General
Document
City Hall Repairs Project Manual
General - Type
Agenda Item
Date
1/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WJE <br /> <br />ENGINEERS <br />AI1.CHITECTS <br />MATERiAlS SC1ENT1$TS <br /> <br />Wiss, Janney, Elstner Associates, Inc. <br />600 Highway 169 South, Suite 1520 <br />Minneapolis, Minnesota 55426 <br />952.545.0295 tell 952.544.6954 fax <br />www.wje.com <br /> <br />Via Email and US Mail <br /> <br />19 December 2007 <br /> <br />Mr. Dave Scherbel <br />Building Official <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, Minnesota 55112-5743 <br /> <br />Re: Exterior Facade Repairs <br />WJE No. 2005.5144.5 <br /> <br />Dear Mr. Scherbel: <br /> <br />Wiss, Janney, Elstner Associates, Inc. (WJE) is pleased to provide you with this proposal for providing <br />architectural and engineering related services for a limited scope of exterior repairs to address the <br />observed water leakage at the Arden Hills City Hall building in Arden Hills, Minnesota. TIns proposal is <br />a follow-up to the City Council work session attended by WJE in September 2007 and our recent <br />telephone conversations. <br /> <br />SCOPE OF SERVICES <br /> <br />This proposal addresses the following tasks: <br /> <br />l. Preparation of construction documents and obtain contractor bids for installing new through. wall <br />flashing along relieving angles (WJE Work Session Item 3). <br />a. WJE will prepare a Project Manual for the required repair work. The Project Manual will contain <br />bidding and contracting requirenlents, technical specifications, and drawings. Division 0 - <br />Bidding and Contract Requirements of the Project Manual was previously reviewed by the City <br />of Arden Hills (City) for the chimney repair project that was completed in 2007. We assume the <br />same standard AlA contracts and bidding requirements will be used and that the construction will <br />be competitively bid following the City's requirements. <br />b. During the bidding process, we will: <br />(l) Attend a pre-bid meeting to answer any questions the bidding contractors may have. <br />(2) Prepare addenda as required to answer questions generated during the pre-bid meeting or <br />bidding process. The addenda will be used both for clarifications and for any changes that <br />arise from these questions. The addenda become part of the contract documents. <br />(3) Provide a tabulated sumnlary of the bids and assist the City in selecting a contractor. <br />c. Our design will be based upon our field measurements, conditions that have been exposed to date <br />and the original design drawings. Until demolition is underway however, we will not know how <br />well the as.built construction matches the original design drawings. It is likely that some <br />unforeseen conditions will be encountered once the repair work starts that will necessitate <br /> <br />Headquarters & Laboratories-Northbrook, Illinois <br />Atlanta I Austin l805ton I Chicago I Cleveland I Dallas I Denver I Detroit I Honolulu I Houston <br />Los Angeles I Minneapolis I New Haven I New York I Princeton I San Francisco I Seattle I Washington, DC <br />
The URL can be used to link to this page
Your browser does not support the video tag.