<br />WJE <br /> <br />ENGiNEERS <br />ARCHITECTS <br />MATERIALS SCil:N1TSTS <br /> <br />Mr. Dave Scherbel <br />City of Arden Hills <br />19 December 2007 <br />Page 2 <br /> <br />additional inspection and office time to develop appropriate repair details for construction. This <br />additional design time is not included in our estimated budget for this phase of our work. <br /> <br />2. Prepare schematic details and obtain an estimated cost for maintenance related repairs at coping <br />stones (WJE Work Session Item 4A). This task would consist of inspecting the stone coping, <br />identifying maintenance repairs, and preparing details for preliminary pricing by one or two local <br />masonry repair contractors. The repair work would likely include the following: <br />a. Replacing failed coping sealant joints <br />b. Resetting displaced coping stones <br />c. Replacing damaged coping stones <br /> <br />3. Prepare schematic details and obtain an estimated cost for removing and replacing coping stones with <br />proper overhang with drip and through-wall flashing (WJE Work Session Item 4B). This task would <br />consist of preparing details for preliminary pricing by one or two local masonry repair contractors. <br /> <br />The objective of Tasks 2 and 3 would provide the City with estimated costs for budgeting purposes only. <br />These tasks do not include preparing detailed construction documents or obtaining bids from contractors. <br /> <br />ADDITIONAL SERVICES <br /> <br />During the construction phase, we will: (I) attend a pre-construction meeting; (2) perform periodic site <br />inspections during the repair process and prepare field reports; (3) perform an inspection at substantial <br />completion to judge if the work we are able to observe at the time of our periodic inspection visits and at <br />the time of our substantial completion inspection are in general conformance with the drawings and <br />specifications; (4) review snbmittals; (5) respond to contractor qnestions; (6) administer changes in the <br />work; and (7) review payment applications. <br /> <br />The length and frequency of the site inspections to be performed by WJE has yet to be determined and <br />will be a function of the contractor selected and the project schedule. <br /> <br />BUDGET <br /> <br />WJE proposes to perform the above noted work for the following estimated fees <br /> <br />Table 1. Fee estimate <br /> <br />Task Description Lump sum fee <br />1 Prepare flashing repair bid documents and assist with bidding $15,000 <br />2 Prepare coping repair details and obtain repair estimates $3,500 <br />3 Prepare coping replacement details and obtain repair estimates $3,500 <br /> Total: $22,000 <br /> <br />The work will be performed in accordance with our Standard Terms and Conditions dated 8 October <br />2007. <br />