Laserfiche WebLink
<br />City of Arden Hills <br /> <br />ESTIMATE OF QUANTITIES AND COSTS <br />2008 PMP Ridgewood. Asbury <br /> <br />STREET CONSTRUCTION <br /> <br /> TOTAL Unit Total <br />Item No. Item Unit Quantitv Price Amount <br />2021.501 MOBILIZATION, 5% MAX. LS 1.00 $ 5,000.00 $ 5,000.00 <br />2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 53.0 $ 7.00 $ 371.00 <br />2104.503 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SY 106 $ 4.00 $ 422.22 <br />2104.503 REMOVE BRICK DRIVEWAY SY 21 $ 10.00 $ 208.89 <br />2104.503 REMOVE BITUMINOUS STREET PAVEMENT SY 2215.0 $ 3.00 $ 6,645.00 <br />2105.501 COMMON EXCAVATION CY 770 $ 12.00 $ 9,240.00 <br />2105.507 SUBGRADEEXCAVATION CY 200 $ 16.00 $ 3,200.00 <br />2105.522 SELECT GRANULAR BORROW CY 260 $ 20.00 $ 5,200.00 <br />2211.501 AGG. BASE, CL. 5 (100% crushed limestone) TON 945.0 $ 14.00 $ 13,230.00 <br />2350.609 TYPE MVWE35035B, WEARING COURSE TON 160.0 $ 53.00 $ 8,480.00 <br />2350.609 TYPE LVNW35030B, BASE COURSE TON 160 $ 51.00 $ 8,160.00 <br />2357.502 TYPE LVWE35030B, BIT. DWY REPLACEMENT SY 65.0 $ 35.00 $ 2,275.00 <br />2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 100.0 $ 2.50 $ 250.00 <br />SC703.4 BITUMINOUS CONTROL JOINT LF 500.0 $ 2.00 $ 1,000.00 <br />2506.522 ADJUST MANHOLE FRAME AND RING EACH 3 $ 750.00 $ 2,250.00 <br />2504.602 ADJUST GATE VALVE EACH 2 $ 300.00 $ 600.00 <br />2521.501 CONCRETE DRIVEWAY PAVEMENT, (6") SY 115.0 $ 50.00 $ 5,750.00 <br />2531.501 CONCRETE CURB & GUTTER, DESIGN B.618 LF 1256.0 $ 9.50 $ 11,932.00 <br />2575.505 SOD, WITH 6" TOPSOIL SY 1405.0 $ 6.00 $ 8,430.00 <br /> SUBTOTAL STREET CONSTRUCTION $ 92,644.11 <br /> 10% contingency $ 9,264.41 <br /> 32% overhead $ 32,610.73 <br /> TOTAL ESTIMATED STREET CONSTRUCTION $ 134,519.25 <br />