Laserfiche WebLink
<br />City of Arden Hills <br /> <br />ESTIMATE OF QUANTITIES AND COSTS <br />2008 PMP Ridgewood- Asbury <br /> <br />STORM SEWER <br /> <br /> TOTAL Unit Total <br />Item No. Item Unit Quantitv Price Amount <br />2105.501 COMMON EXCAVATION CY 135 $ 12.00 $ 1,620.00 <br />2105.522 SELECT GRANULAR W/30% ORGANIC PEAT CY 80 $ 30.00 $ 2,400.00 <br />2503.541 18" RCP, DESIGN 3006, CLASS 5 LF 50.0 $ 30.00 $ 1,500.00 <br />2506.501 CONSTRUCT MANHOLE (TYPE B) EACH 2.0 $ 1,250.00 $ 2,500.00 <br />2506.502 CONNECT TO EXISTING CATCH BASIN EACH t $ 1,000.00 $ 1,000.00 <br />2506.516 CATCH BASIN CASTING (R-3067) EACH 2 $ 350.00 $ 700.00 <br />2571.509 DECIDUOUS SHRUB #5 CONT SHRUB 10 $ 40.00 $ 400.00 <br />2571.510 DECIDUOUS SHRUB #1 CONT SHRUB 20 $ 20.00 $ 400.00 <br />2571.511 PERENNIAL. #1 CONT. PLANT 65 $ 12.00 $ 780.00 <br />2571.512 PERENNIAL- 4" PLUG PLANT 210 $ 8.00 $ 1,680.00 <br />2575.511 MULCH CY 15 $ 30.00 $ 450.00 <br />2575.604 PLANTER EDGING LF 360 $ 5.00 $ 1,800.00 <br /> . <br /> SUBTOTAL STORM SEWER $ 15,230.00 <br /> 10% contingency $ 1,523.00 <br /> 15% Engineering $ 2,284.50 <br /> TOTAL ESTIMATED STORM SEWER COST $ 19,037.50 <br /> <br />SANITARY SEWER <br /> <br />I TOTAL Unit Total <br /> Item No. Item Unit Quantitv Price Amount <br /> 2506.602 REHABILITATE MANHOLE EACH 1 $ 1,000.00 $ t ,000.00 <br /> .- <br /> SUBTOTAL STORM SEWER $ 1,000.00 <br /> 10% contingency $ 100.00 <br /> 15% Engineering $ 150.00 <br /> TOTAL ESTIMATED SANITARY SEWER COST $ 1,250.00 <br />