Laserfiche WebLink
<br />As of 01/07/08 <br /> <br /> <br />2. Failure to collect properly notified missed collections - $250 per incident. <br /> <br />3. Failure to provide monthly and annual reports - $100 per incident. <br /> <br />4. Failure to complete the collections within the specified timeframes without proper <br />notice to the city - $100 per incident. <br /> <br />5. Failure to clean up from spills during collection operations - $250 per incident plus <br />any costs incurred by the City. <br /> <br />6. Failure to report on changes in location of recyclables processing operations - <br />$250 per incident. <br /> <br />7. Failure to provide written description of the means to estimate relative amount of <br />process residuals derived from the City's recyclables - $100 per incident. <br /> <br />8. Exceeding any maximum process residuals rate that may be negotiated as part of <br />a final contract agreement - $1,000 per exceedence. <br /> <br />9. Failure to receive City written approval of changes to the "dual stream" collection <br />and processing systems prior to implementing any such change - $5,000. <br /> <br />10. Failure to conduct annual composition analysis - $100 per incident. <br /> <br />These amounts will be for liquidated damages for losses suffered by the City and not <br />penalties. <br /> <br /> <br />31. Damage to Property <br /> <br />The Contractor shall take all necessary precautions to protect public and private property. <br />Except for reasonable wear and tear, the Contractor shall repair or replace any private or <br />public property, including, but not limited to sod, mailboxes, or recycling bins, which are <br />damaged by the Contractor. Such property damage shall be addressed for repair or <br />replacement, at no charge to the property owner, within forty-eight (48) hours with property of <br />the same or equivalent value at the time of the damage. <br /> <br />If the Contractor fails to address the repair or replacement damaged property within forty- <br />eight (48) hours, the City may, but shall not be obligated to, repair or replace such damaged <br />property, and the Contractor shall fully reimburse the City for any of its reasonably incurred <br />expenses. The Contractor shall reimburse the City for any such expenses within ten (10) <br />days of receipt of the City's invoice. <br /> <br />32. Recycling Collection <br /> <br />The Contractor shall conform to the following provisions when collecting recyclables in the <br />City: <br /> <br />1. The Contractor shall structure routes so that lighter-loaded trucks travel on the <br />streets with poorer construction. The City shall provide road condition information <br />to the Contractor. <br /> <br />14 <br />