My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7D, TCAAP Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
01-28-08-R
>
7D, TCAAP Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2008 3:16:00 PM
Creation date
1/25/2008 3:14:17 PM
Metadata
Fields
Template:
General
Document
TCAAP Status Update
General - Type
Agenda Item
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Communication Strategy <br /> <br />. Staff met with Davis Conununications on January 23, 2008 to review the updated draft of the <br />conununications plan. The plan will be reviewed by the Conununications Conunittee at their <br />meeting in February and then forwarded to the City Council for review and conunent. <br /> <br />Engineering Consultant(s) <br /> <br />. Staff met with WSB on January 24, 2008 to discuss preliminary findings regarding water and <br />sanitary sewer required to service TCAAP. WSB will develop a water system model including <br />all City pressure zones to assist in evaluating booster pumps capacities and alternatives to <br />reducing the size and height of the proposed water tower for cost savings, In addition they will <br />be reviewing service options for the sanitary sewer to assist in detennining capacity need, <br />treatment and cost. <br /> <br />Project Status Memo <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.