Laserfiche WebLink
<br />Communication Strategy <br /> <br />. Staff met with Davis Conununications on January 23, 2008 to review the updated draft of the <br />conununications plan. The plan will be reviewed by the Conununications Conunittee at their <br />meeting in February and then forwarded to the City Council for review and conunent. <br /> <br />Engineering Consultant(s) <br /> <br />. Staff met with WSB on January 24, 2008 to discuss preliminary findings regarding water and <br />sanitary sewer required to service TCAAP. WSB will develop a water system model including <br />all City pressure zones to assist in evaluating booster pumps capacities and alternatives to <br />reducing the size and height of the proposed water tower for cost savings, In addition they will <br />be reviewing service options for the sanitary sewer to assist in detennining capacity need, <br />treatment and cost. <br /> <br />Project Status Memo <br /> <br />2 <br />