My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-08-Special
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2008
>
02-28-08-Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 1:27:10 PM
Creation date
2/22/2008 3:10:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills - Comprehensive Plan - DRAFT <br />• Any construction or alteration located on a public use airport or heliport <br />regardless of height or location. <br />Persons or organizations intending to sponsor construction or alterations <br />require notification to the FAA under Title 14, Part 77.13 using FAA form <br />7460-1 and associated amendments. Any structure meeting the <br />requirements in Title 14, Part 77.13 must receive permission from the <br />Minnesota Department of Transportation (MnDOT) and the Federal <br />Aviation Administration (FAA). Structures will be compatible with the <br />Anoka County/Blaine Airport Long Term Comprehensive Plan. <br />Pathways: Bikeways, Sidewalks and Trails <br />The 2002 Arden Hills Park, Trails, and Open Space (PTOS) Plan <br />discusses future bikeway, sidewalk and trail locations. Future shoulder, <br />bikeway, sidewalk, and trail locations are also discussed in the geometric <br />design standards section of Appendix X, to be pursued along or adjacent <br />to most collector roadways. For each of the County highways within <br />Arden Hills, roadway shoulders, in addition to trails and sidewalks, are <br />recommended on both sides of the roadway to accommodate pedestrian, <br />bicycle, and other non -motorized travel where feasible. <br />The City will review pedestrian facilities and school routings to determine <br />their adequacy as traffic conditions change. Shoulders, bikeways, <br />sidewalks and trails will be integrated with the roadway system to provide <br />routes for non -motorized traffic to access existing and future controlled <br />intersections. Non -motorized facilities are to be incorporated into road <br />projects and land redevelopments to safety accommodate pedestrians and <br />bicycles with vehicle traffic in the City, as the City grows. <br />While pathways are an integral part of the City's transportation system, <br />specific pathway needs are described in Chapter 9: Parks and Recreation. <br />The improvements and expansions in that chapter are required to ensure <br />a sound transportation within Arden Hills. <br />11.4 Implementation <br />In progress <br />DRAFT 64 <br />2/22/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.