Table 4-11
<br />MnDOT Highway Work Plan, 2009-2013
<br />Major Construction, Reconstruction and Bridge Replacement Greater Than $10 Million
<br />T-16
<br />Project Cost Estimates
<br />Design
<br />R/W
<br />Year -of-
<br />Construction
<br />Total
<br />Project
<br />Construction
<br />Estimate
<br />Estimate
<br />Construction
<br />Engineering
<br />Project
<br />Highway
<br />Description
<br />Program
<br />Fiscal Year
<br />($000)
<br />($000)
<br />Estimate
<br />Estimate
<br />Cost
<br />($000)
<br />($000
<br />$000
<br />35E
<br />1-94 to Maryland
<br />MC
<br />2010
<br />7,687
<br />Limited
<br />76,755
<br />6,140
<br />90,571
<br />Ave. in St. Paul,
<br />grading, surfacing,
<br />brs., etc., including
<br />Cayuga Br. and
<br />Phalen Blvd.
<br />connection
<br />35W
<br />At Lake St. in
<br />MC
<br />2009
<br />1,160
<br />Contin-
<br />11,600
<br />928
<br />13,688
<br />Minneapolis,
<br />uous/
<br />reconstmct inter-
<br />Major
<br />than e Ph. 1
<br />35W
<br />At Lake St. in
<br />MC
<br />2010
<br />1,785
<br />Contin-
<br />17,850
<br />1,428
<br />21,063
<br />Minneapolis,
<br />uous/
<br />reconstruct inter-
<br />Major
<br />than e Ph.2
<br />36
<br />At Lexington
<br />MC
<br />2009
<br />1,380
<br />Limited
<br />13,804
<br />1,104
<br />16,289
<br />Ave.. in Roseville,
<br />replace Br. 5723
<br />and reconstruct
<br />interchange
<br />100
<br />36" St. to Cedar
<br />MC
<br />2011
<br />6,150
<br />Comm-
<br />61,500
<br />4,920
<br />72,570
<br />Lake Rd. in St.
<br />uous/
<br />Louis Park,
<br />Major
<br />grading, surfacing,
<br />Brs., etc. for 6 -lane
<br />freeway
<br />169
<br />Near CSAH 6 in
<br />MC
<br />2010
<br />1,904
<br />Limited
<br />19,040
<br />1,523
<br />22.467
<br />Belle Plaine,
<br />grading, surfacing,
<br />Br., etc. for new
<br />interchange
<br />694
<br />Eof135Win
<br />MC
<br />2012
<br />6,960
<br />Minimal/
<br />69,596
<br />5,568
<br />82,123
<br />Arden Hills to E of
<br />Spot
<br />Lexington Ave.. in
<br />Shoreview,
<br />grading, surfacing,
<br />Brs., etc. to add
<br />third lane and
<br />correct weave at
<br />TH 10/51
<br />TOTALS
<br />27,015
<br />1
<br />270,145
<br />21,611 1
<br />318,771
<br />T-16
<br />
|