Laserfiche WebLink
Table 4-11 <br />MnDOT Highway Work Plan, 2009-2013 <br />Major Construction, Reconstruction and Bridge Replacement Greater Than $10 Million <br />T-16 <br />Project Cost Estimates <br />Design <br />R/W <br />Year -of- <br />Construction <br />Total <br />Project <br />Construction <br />Estimate <br />Estimate <br />Construction <br />Engineering <br />Project <br />Highway <br />Description <br />Program <br />Fiscal Year <br />($000) <br />($000) <br />Estimate <br />Estimate <br />Cost <br />($000) <br />($000 <br />$000 <br />35E <br />1-94 to Maryland <br />MC <br />2010 <br />7,687 <br />Limited <br />76,755 <br />6,140 <br />90,571 <br />Ave. in St. Paul, <br />grading, surfacing, <br />brs., etc., including <br />Cayuga Br. and <br />Phalen Blvd. <br />connection <br />35W <br />At Lake St. in <br />MC <br />2009 <br />1,160 <br />Contin- <br />11,600 <br />928 <br />13,688 <br />Minneapolis, <br />uous/ <br />reconstmct inter- <br />Major <br />than e Ph. 1 <br />35W <br />At Lake St. in <br />MC <br />2010 <br />1,785 <br />Contin- <br />17,850 <br />1,428 <br />21,063 <br />Minneapolis, <br />uous/ <br />reconstruct inter- <br />Major <br />than e Ph.2 <br />36 <br />At Lexington <br />MC <br />2009 <br />1,380 <br />Limited <br />13,804 <br />1,104 <br />16,289 <br />Ave.. in Roseville, <br />replace Br. 5723 <br />and reconstruct <br />interchange <br />100 <br />36" St. to Cedar <br />MC <br />2011 <br />6,150 <br />Comm- <br />61,500 <br />4,920 <br />72,570 <br />Lake Rd. in St. <br />uous/ <br />Louis Park, <br />Major <br />grading, surfacing, <br />Brs., etc. for 6 -lane <br />freeway <br />169 <br />Near CSAH 6 in <br />MC <br />2010 <br />1,904 <br />Limited <br />19,040 <br />1,523 <br />22.467 <br />Belle Plaine, <br />grading, surfacing, <br />Br., etc. for new <br />interchange <br />694 <br />Eof135Win <br />MC <br />2012 <br />6,960 <br />Minimal/ <br />69,596 <br />5,568 <br />82,123 <br />Arden Hills to E of <br />Spot <br />Lexington Ave.. in <br />Shoreview, <br />grading, surfacing, <br />Brs., etc. to add <br />third lane and <br />correct weave at <br />TH 10/51 <br />TOTALS <br />27,015 <br />1 <br />270,145 <br />21,611 1 <br />318,771 <br />T-16 <br />