My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4B, Cummings Park and Hazelnut Hard Court Reconstruct
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
03-10-08-R
>
4B, Cummings Park and Hazelnut Hard Court Reconstruct
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2008 9:36:14 AM
Creation date
3/7/2008 9:33:04 AM
Metadata
Fields
Template:
General
Document
Cummings Park/Hazelnut Hard Court
General - Type
Agenda Item
Date
3/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br /> <br />~ <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />March 10, 2008 <br /> <br />TO: <br /> <br />Mayor and City Council <br />Jim Willis, Interim City Administrator <br /> <br />Michelle Olson, Parks and Recreation Manager 1f({} <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Award of bid for the Cummings Park Hard Court Recoustruct <br />Project, including the resurface of the Hazelnut Park and Ridgewood <br />neighborhood courts. <br /> <br />BACKGROUND <br />WSB and Associates, Inc. were selected by the City Council in September of2007 to prepare <br />plans and specifications for the tennis court reconstruction project at Cummings Park. After <br />plans and specifications were completed, WSB and Associates, Inc. solicited quotes from five <br />contractors who specialize in tennis court reconstruction. The quotes were returned with an <br />average price of approximately $65,000. Since the quotes exceeded $50,000, and the project <br />would need to be advertised for competitive bids, the City Council directed staff to delay the <br />Cummings Park Hard Court reconstruction until spring of2008 at their Regular City Council <br />Meeting on October 29,2007. At that time, staff was directed to update the 2008 budget and <br />also include the resurface of the hard courts at Hazelnut Park and the Ridgewood neighborhood <br />(commonly referred to as Sheehy Park). The City Council authorized the advertisement of bids <br />for this project at their Regular Meeting on January 14, 2008. <br /> <br />The bid opening for this project took place on February 28, 2008 at the Arden Hills City Hall. <br />There were a total of eight bids submitted with the lowest bidder being Buck Blacktop, Inc. The <br />following is a list of the bids received: <br /> <br />BIDDER BASE BID AMOUNT <br />Buck Blacktop, Inc. $63,749.00 I <br />Barber Construction, Inc. $63,994.00 <br />Northwest Asphalt, Inc. $68,824.00 <br />Bituminous Roadways, Inc. $69,420.00 <br />T.A. Schifsky & Sons, Inc. $69,834.00 <br />Midwest Asphalt Corporation $75,550.00 <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\Bid Approval - Cummings Park Tennis.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.