Laserfiche WebLink
<br />Cummings Park - Bid Approval <br />3/5/2008 <br />Page 2 <br /> <br />FPI Paving Contractors, Inc. <br />North Valley, Inc. <br /> <br />$76,775.00 <br />$91,651.50 <br /> <br />After reviewing their proposals, staff recommends that we engage Buck Blacktop, Inc. to <br />complete this work at a labor cost not to exceed $63,749.00 for the base bid. <br /> <br />Four alternates were included in addition to the base bid. They included: <br /> <br />1. Furnishing, installing, and maintaining sod and four inches of topsoil for all disturbed <br />areas as specified. <br />2. Removal of existing tennis ball bounce wall plywood, and furnishing, installation, and <br />painting of new plywood. <br />3. Mobilization, removal of existing tennis bounce wall concrete base, wood frame and <br />plywood, furnishing and installation of new chain link fence posts as specified, <br />modification of existing fence, furnishing, installation, and painting of new plywood, and <br />hanging on chain link fence. <br />4. Install a two inch thick hand tamped bituminous apron including mobilization, <br />preparation of base, furnishing and installation including compacting. <br /> <br />Staff recommends that alternate four be added to the base bid for this project. The bituminous <br />apron is designed to keep grass from growing into the court area. Buck Blacktop, Inc. gave a bid <br />of $2,444.00 for this alternate. Staff has determined that the tennis bounce wall is in good shape <br />and recommends that it be left as is and our Maintenance Staffwill put a fresh coat of paint on it, <br />versus adding alternate two or three. Staff also recommends that City Staff install and maintain <br />the sod around the Cummings Court Project versus engaging Buck Blacktop, Inc. for alternate <br />one. The sod replacement should be minimal with the addition of alternate four. Staff <br />recommends approval of a total project bid of $66, 193.00. <br /> <br />BUDGET <br />The engineer's estimate for the Cummings Park reconstruction project was $71,000. Staff <br />budgeted $70,000 from the Special Revenue Fund for the Cummings Park reconstruct project <br />and $17,500 from the General Fund for the resurface projects. The breakdown of costs is as <br />follows: <br /> <br />Cummings Park Reconstruct Project: <br />Alternate Four: <br />Special Park Fund Expenditure: <br /> <br />$53,740.00 - construction <br />$ 2.444.00 <br />*$56,184.00 <br /> <br />Ridgewood Tennis Court Resurface: <br />Hazelnut Hard court Resurface: <br />General Fund Expenditure: <br /> <br />$ 4,820.00 <br />$ 5,189.00 <br />*$10,009.00 <br /> <br />*These totals do not include engineering expenses. <br />