My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A, City Hall Masonry Facade Repairs
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
03-31-08-R
>
7A, City Hall Masonry Facade Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2008 1:56:35 PM
Creation date
3/27/2008 1:49:53 PM
Metadata
Fields
Template:
General
Document
City Hall Masonry Facade Repairs
General - Type
Agenda Item
Addressee
1245 West Highway 96
Date
3/31/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The City's contract engineer for the Masonry Facade project, Brian Pashina, with Wiss, Janey, <br />Elstner, & Associates has reviewed the five bids and recommends that the City contract with the <br />low bidder, AJ. Spanjers Company, Inc. The engineer also recommends having AJ.Spanjers <br />perform the work in the alternate bid, removing and reflashing the parapet coping stones. This <br />would include proper anchoring of the coping stone. <br /> <br />After the removal of the stone, our engineering firm, Wiss, Janey, Elstner, will conduct an <br />examination of the existing conditions. Based on WJE's observations, there may be additional <br />costs for the repair, based on the finding. Since these repairs will be of a time sensitive nature, <br />staff also seeks authorization for additional repairs not to exceed $41,700, as maybe <br />recommended from WJE. <br />(See attached cost estimate prepared by WJE) <br /> <br />WJE originally estimated the cost of these repairs to be around $220,000 to $290,000. <br /> <br />Financial Implications <br /> <br />Funding for this project is available from the Equipment Building and Replacement Fund. This <br />fund was established during the 2008 budgeting process and City Hall repairs were budgeted in <br />the 2008-2012 Capital Improvement plan from this fund. <br />The City will be utilizing funds received from the mediation settlement. <br /> <br />Requested Action <br /> <br />Motion to Award the Contract dated 3/11/08 for the City Hall Masonry Facade Repairs Project- <br />to AJ. Spanjers Company, Inc, for an amount not to exceed $221,790.00, and to Wiss, Janey, <br />Elstner, for an amount not to exceed $23,000. <br /> <br />(This includes the bid amount of $136,773.00 plus $66,317.00 for alternate I, and an additional <br />$41,700.00 (as needed) in repairs that may be necessary upon discovery by WJE after removal of <br />the existing stone.) <br /> <br />C:\Documellts and Settings\noah.simon\Local Seuings\Temporary Intemet Files\OLK6C\Masomy Facade repair-City Council mcmo3-31-08 <br />(2).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.