Laserfiche WebLink
<br />5. A portion of the wetland area of 1900 Lake Johanna Boulevard was regarded to maintain drainage away from the <br />property owner's back yard and home. Adjustments were also made to the skimmer system to ensure it was working <br />properly. <br /> <br />Lump Sum Cost= <br /> <br />$ 719.80 <br /> <br />6. The curb cut to the 1480 Skiles Lane raingarden was not directing runoff to the raingarden. The curb cut was <br />removed and replaced, and the swale to the raingarden was also regraded. <br />Lump Sum Cost= $ 899.63 <br /> <br />Subtotal Schedule B - Storm Draiuage <br /> <br />$ 3,877.34 <br /> <br />CHANGE ORDER SUMMARY <br /> <br />Schedule A - Roadway <br />Schedule B - Storm Drainage <br /> <br />$ 2,394.10 <br />$ 3.877.34 <br /> <br />$ 6,271.44 <br /> <br />Total Contract Modification for Change Order No.4 <br /> <br />End of Change Order No.4 <br />