My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-07-08-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2008
>
05-07-08-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 1:28:29 PM
Creation date
5/1/2008 2:01:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Of the 131 acres of vacant land in 2008, approximately 70 acres are <br />zoned for residential, 40 acres are zoned commercial, and 21 acres are <br />light industrial. The vacant land does not include the TCAAP property, <br />which is currently classified as public/institutional land. <br />The current land uses on the TCAAP property are the most notable <br />differences from what was expected in the 1998 future land uses. Since <br />1998, the number of acres that were anticipated to be part of the TCAAP <br />redevelopment has been reduced and the redevelopment delayed. While <br />a specific redevelopment timeline for TCAAP has not been set, much of <br />the redevelopment is anticipated to occur in phases over the next ten to <br />twenty years depending on market conditions. <br />Page 54; [4] Deleted '' James Lehnhoff 5/1/2008 11:15 AM <br />Arden Manor Park - Provide a new entrance drive, parking lot and trail <br />connection when Highway 96 is reconstructed. Add a looped trail <br />around the pond and to the future TCAAP trails. Define edges of the <br />park with new trees and landscaping. Add new shaded benches near <br />park features. Add a sign and map at the park entrances to provide <br />parks and trail identification. <br />Arden Oaks Park - Add a paved trail from north to south across the <br />park to connect the park features and to meet ADA accessibility <br />requirements. Add benches and trash containers near the park <br />features. Add trees and landscaping to provide shade, spatial <br />definition, and to improve aesthetics. <br />Charles Perry Park — Move entrance drive to line up with Thom Drive. <br />Add new warming house in close proximity to the skating rink (this will <br />eliminate the conflict with skaters having to cross the entrance drive). <br />Add a drinking fountain with jug filler. Pave the existing skating rink for <br />inline skating and half court basketball). Add a new open ice skating <br />area. Turn existing warming house into a storage shed. Add a paved <br />trail connecting the parking lot to the play structure and a trail from the <br />future picnic shelter to the unpaved trails below hill. Add a kiosk map <br />and identification sign. Complete trail from pavilion to Tony Schmidt <br />underpass trail. Work with Bethel University to provide access across <br />and to the Ona Orth sports complex. Acquire the single family home' <br />nearest the park to accommodate future uses. <br />Chatham Trails — Add a sign and map at the park entrances to provide <br />park and trail identification. <br />Crepeau Park — Add a new unpaved trail from Pine Tree Drive to <br />Benton Way on the north side of the wetland. Add a new unpaved trail <br />
The URL can be used to link to this page
Your browser does not support the video tag.