My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 7C, 2007 Engineering Review
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
05-12-08-R
>
Item 7C, 2007 Engineering Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 3:52:27 PM
Creation date
5/8/2008 3:50:29 PM
Metadata
Fields
Template:
General
Document
2007 Engineering Review
General - Type
Agenda Item
Date
5/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Engineering Joint Pmvers Agreement <br />2007 Summary <br /> <br />May 6, 2008 <br />Page3 of 4 <br /> <br />that will be addressed in 2008, these are; assessment appcals, as-builts and punchlist items. <br />However, we do not anticipate that there will be significant costs. <br /> <br />A summary of the costs to date: <br /> <br />Total Civil Engineer <br />Total other employees <br />Total 2006 costs <br />Total project costs to date <br />Total Agreement costs to date <br /> <br />Project No. 07-07 <br />$16,7]6.03 (292.75 hrs) <br />$42,047.58 (531.0 hrs) <br />$l5,209.03 <br />$73,972.63 <br />$77,341.53 <br /> <br />Project No. 07-]3 <br />$171.30 (3 hrs) <br />$3,]97.60 (45.5 hrs) <br />$0 <br />$3,368.90 <br /> <br /> <br />. Proiects 07-02 & 08-07: On January 29, 2007, the City Council approved an agreement for the <br />City of Roseville to complete the design on the following street segments: <br /> <br />Proiect No. 07-02: Neighborhood 10 Reconstruction <br />Asbury A venue and Ridgewood Road, City limits to Glenhill Road <br /> <br />Proiect No. 08-07: Glenarden Neighborhood Reconstruction <br />North Snelling A venue, Arden Place to Dead End <br />Arden Place, Snelling A venue to Glenarden Road <br />Forest Lane, Snelling Avenuc to Glenarden Road <br />Skiles Lane, Snelling A venue to Glenarden Road <br />Glenarden Court, Skiles Lane to Glenarden Road <br />Glenarden Road, Snelling Avenue to Dead End <br /> <br />The City Council requested that the Glenarden neighborhood reconstruction project be delayed <br />until the 2009 construction season. As a result the street segments were broken into two City <br />project numbers. Each of these projccts is at a different stage in developmcnt. <br /> <br />For Project No. 07-02: we have completed the following work: feasibility report, preliminary <br />survey, preliminary construction drawings, a feasibility report, engineer's estimate, and stonn <br />water design. A public hearing was held at the February I 1 City Council meeting; the City <br />Council voted to partner in a joint storm sewer project which would include the construction <br />of rain gardens along the street boulevards up to Glenhill Road, This project was awarded to <br />Midwest Asphalt at the April 28 City Council mecting. Construction started this week. The <br />street reconstruction plans are at 60% development, which will be used when the City <br />delelmines that these streets should be reconstructed. <br /> <br />For Project No. 08-07; we have completed preliminary survey, some neighborhood meetings, <br />and the plans and specifications are at 50% development. As a result, we anticipate that <br />design and feasibility studies cost will be less than anticipated in the scoping document. <br /> <br />Our proposed costs for the design and feasibility report were estimated at $126,776.00. The <br />total billing for these projccts through December 3 I, 2007: <br />
The URL can be used to link to this page
Your browser does not support the video tag.