<br />Engineering Joint Powers Agreement <br />2007 Summary <br /> <br />May 6,2008 <br />Page 2 of 4 <br /> <br />Engineer worked on an RFP to hire Bonestroo engineering to assist the City in analyzing the system <br />to finding the sources. We now better understand the scope of the problem and have preliminarily <br />identified potential locations. The additional analysis scheduled for this year will put us on the path in <br />our ongoing effort to eliminate the excessive 1&1 that has been identified by the Met Council. <br /> <br />. NPDES Phase]] Pernlit Update: The City's NPDES permit and Stormwater Pollution Prevention <br />Plan (SWPPP) was reviewed by the MPCA and posted for public comment in January, 2008. In <br />preparation for this public comment period, we provided the Public Works Director with assistance in <br />updating some of the technical sections of the permit. This additional time also included Roseville <br />support staff and City Engineer involvement. These hours were not documented as project related, <br />but rather as job code 319-Drainage and 330-Erosion Control. <br /> <br />. Project No. 06- 13- 2006 PMP project: We spent additional time last year working on asscssment <br />appeals and punchlist items for the 2006 PMP project. One follow- up item remains, which is the <br />additional landscaping authorized by the City Council in November, 2006. This work is anticipatcd <br />to occur this summer. <br /> <br />. Planning Case Reviews: A number of planning cases were reviewed in 2007, including 07-15: <br />Hazelnut 3rd Addition, 07- 1 5: Christiansen Estates, 07- I 6: Chesapeake Properties, 07- I 9: Arden <br />Plaza, and 08-11 Northwestern College. The Civil Engineer spent almost 40 hours of her time <br />assisting with the review of these applications. We also had a Project Coordinator assigned to <br />observe the public improvement construction on Hazelnut 3rd Addition; he spent 38 hours providing <br />quality control for this project. This will ensure that the developer's engineer ohserves City <br />requirements during the building process. All of these costs were reimbursed by the Developer. <br /> <br />. Project No. 07-08- 2007 Seal Coat: the Civil Engineer assisted the Public Works Director with plan <br />and specification preparation and construction administration. We also had a Project Coordinator <br />assigned to observe the work. <br /> <br />. Project No. 07-09- TCAAP: the Civil Engineer spent 126.5 hours of her time working on issues <br />related to TCAAP. The City Engineer also spent 46 hours assisting with coordination of the public <br />improvements with Mn/DOT and Ramsey County. All of these costs wee reimbursed by the <br />Developer. <br /> <br />Additional Agreement Engineering: <br /> <br />We have expanded the scope of our original agreement to provide Arden Hills with additional <br />engineering support. In 2007, Roseville worked on three construction projects for the City of Arden <br />Hills. <br /> <br />. Proiects 07-07 & 07-13: These projects were designed and developed by the Roseville <br />Engineering Department. They include the 2007 PMP Mill and Ovcrlay and drainage <br />improvements for the following streets: <br /> <br />Karth Lake Circle, Briarknoll Circle, Briarknoll Drive, Brighton Way, Connelly Avenue, <br />Lametti Lane, Lametti Circle, Dawn Circle, and Royal Lane <br /> <br />In our scope letter, we had estimated our proposed costs at $99,800.00. The contractor <br />completed these projects last November. There are still some outstanding issues on this project <br />