My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 8A, Update on Interstate 694, Hwy 10, and CR 96
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
05-27-08-R
>
Item 8A, Update on Interstate 694, Hwy 10, and CR 96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2008 4:32:41 PM
Creation date
5/22/2008 4:30:04 PM
Metadata
Fields
Template:
General
Document
Update on I-694, Hwy 10, CR 96
General - Type
Agenda Item
Date
5/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o DESIGN CONSTRAINT #5 <br /> <br />Provide pedestrian crossing over or under COllll1y Road 96 between Highway 10 and the <br />access point cast or North Heights Lutheran Church. <br /> <br />o CITY PERSPECTIVE <br /> <br />City would like to provide safe access to pedestrians to cross County Road 96 to access <br />trails, etc. <br /> <br />o DESIGN CONSTRAINT #6 <br /> <br />Any bridgc{s) constructed should provide safe pedestrian crossing/access. <br /> <br />o CITY PERSPECTIVE <br /> <br />The Cily \vants to assure there are safe pedestrian connections to its trail system and any <br />crossing over or under Highway 10 or County Road 96 needs to be wide enough to <br />accommodate such access. <br /> <br />CITY PROJECT <br /> <br />III. Preserve full access for residents and businesses between <br />Highway 10 and County Road 96 through development of an <br />interchange that includes access to TCAAP from Highway 10 <br /> <br />]'hc City supports providing full access for residents and businesses between these roadways <br />and access to the TCAAP site rrom Highway 10. However. thc City is or the opinion that <br />the following four aspects need to be further resolved: <br /> <br />]. Determine if an at-grade signalized inlersection can be constructed to provide access to <br />the TCA/\P site on a temporary or permanent basis <br />Number of entrance/exit ramps that need to be constructed for the interchange and \vhen <br />3. How to provide safe access for Scherer Brothers <br />4. Can or should Highway lObe realigned to move the interchange further northeast <br /> <br />o <br /> <br />The City understands that construction or a full interchange/intersection \\"ill need to be <br />shown 011 the plans but would like the ability to review timing and phasing options for the <br />prDject. <br /> <br />o DESIGN CONSTRAINT #1 <br /> <br />Review l\1nDOT model to determine if an at-grade signalized intersection at Highway <br />I (J into. the TCAAI' site can be constructed. <br /> <br />o CITY PERSPECTIVE <br /> <br />City is of the opinion that this is a viable option as a temporary or permanent solution <br />and would like to review timing. phasing options and costs. <br /> <br />]-694 <lnd Highway 10 and COLI Illy Road 96 Preliminary Design Position Paper <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.