My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Code of Ordinances
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
1970-1979
>
1979
>
Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2008 5:40:29 PM
Creation date
5/22/2008 3:01:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> UTILITIES § 28-44 <br /> <br /> hereof shall be fized by the city engineer on the basis <br /> of the eatimated cost of installing the service. <br /> <br /> (c) A service charge in the amount established by the <br /> council in a resolution adopted thereby will be made for <br /> turning on water where service has been turned off for <br /> violation of any provision of this article, except for cases <br /> subject to section 28-23 hereof, where the higher charge <br /> shall be made. (Ord. No. 103, § 2.2, 11-13-67; Ord. No. 217, <br /> 29-31, 12-29-80) <br /> Sec. 28-43. Time for connections. <br /> If, for any cause, the plumber or contractor laying the <br /> service pipe should fail to have the connection made at the <br /> time specified in his application, notice must be given the <br /> clerk-adminiatrator fixing another day on which he wishea <br /> to make connection. The notice must be given at least two <br /> (2) days previous to the excavation for laying of the aervice <br /> pipe, and the connection must be made before 4:30 p.m., <br /> egcept in special cases, and then the work ahall be done <br /> only upon written order from the commiasioner. In any <br /> event, as hereinbefore provided, connection must be made <br /> within sigty (60) days after the permit ia obtained. (Ord. No. <br /> 103, § 2.3, 11-13-67) <br /> Sec. 28-44. Property assessments. <br /> Before a permit for water main tapping as provided in <br /> section 28-42 hereof shall be isaued the following conditions <br /> shall be complied with: <br /> (a) A connection permit to service, directly or indirectly, <br /> any lot or tract of land shall not be iasued until the <br /> clerk-adminiatrator shall have certified to one of the <br /> following: <br /> (1) That such lot or tract of land has been asaeased <br /> for the cost of conatruction of the water main with <br /> which the connection ia to be made; or <br /> (2) If no asseasment has been levied for such <br /> construction cost, the proceedings for levying such <br /> Supp. No. 3 <br /> 1651 <br /> <br /> <br /> <br /> ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.