Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> Minutes of Public Safety/Works Committee Heeting, January 15, 1987 <br /> Page 3 <br /> the tower, funds to construct a protective fence to prevent vandalism may be <br /> requested. He could then store there some of the materials presently stored <br /> outside of the Public Works Building. <br /> <br /> Sewer Line. North Hamline <br /> Raddatz described the sewer gas smell at this location and his efforts to <br /> locate the cause. The line has been flushed and jetted, all vent pipes in the <br /> surrounding area checked, and the owner has cleaned all the lines inside of his <br /> home. Barry Peters (SEH) is obtaining costs on televising the line. to see if <br /> a dip in the line is causing a build up of sewage that could cause the odor. <br /> Committee discussed briefly cost and method of repair, if this proves <br /> necessary. Sleeving the pipe costs approximately $86/foot, and is accomplished <br /> in a short period of time with minimal disruption to the area. Replacing the <br /> pipe costs approximately s76/foot but requires digging up the street and <br /> replacing it. <br /> Don Zehm recommended strongly, for safety and liability lreasons, that the area <br /> be tested for emission of inethane, when the odor is absent, and again when it <br /> is present. He offered to assist Raddatz in doing this. <br /> Broken Valve CharRe <br /> The Public Works Department has again encountered the problem of homeowner's <br /> valves breaking when water is turned on or off...and resulting time spent by <br /> Public Works employees in going out to turn the water on and off for the <br /> plumbers called for repair. He requested and received Council approval for <br /> charging the responsible individual if overtime hours are involved, and it is <br /> not an emergency situation. <br /> Committee concurred with this, and suggested information about this policy be <br /> glaced in the Town Crier. <br /> ; <br /> ~'Street SweepinA Contract <br /> ° In July of 1986, this Committee recommended to Council that in 1987, a contract <br /> be prepared for Arden Hills' street sweeping, and that the policy of having Nex <br /> Brighton sweep after completion of their sweeping be discontinued. The 1987 <br /> budget was prepared with this in mind, and Raddatz Will bring a proposed <br /> contract to this committee for approval in Pebruary. <br /> CSO Car Report <br /> Raddatz reported that the older squad car has been refurbished and is being <br /> used by the CSO officer, and the car he had been using (a Pontiac Phoenix, <br /> 1981) is being sold. It will be advertised (for bids) in the New BriRhton <br /> Bulletin. Book value is ;1.200, but mileage is high for its age. <br /> Hiscellaneous/Nev Business <br /> Ti.mm suggested the CSO officer be invfted to the February meeting to discuss <br /> his responsibilities and activitfes with the committee. <br /> !lalone reported that the Planning Commission has reviewed the proposed street <br /> lighting plan. They are recommending ta Council implementation of Phase I <br /> ; (major intersections and dangerous curves) as soon as possible, and that the <br /> ' lights listed in Phase II be fnstalled on requests from homeowners only. <br />